Similar Projects
Reported | 05/05/2022 12:00 AM |
Project Title | Seal Coat |
Physical Address | View project details and contacts |
City, State (County) | Barneveld, WI (Iowa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Road Approximate Length Price (in miles, unless noted) Mounds Park Rd 22' x 2,035' $ Bryn Grwyn Rd 20' x 3,800' $ Dugway Rd 0.21 $ Hook Rd 0.50 $ Jones Rd 0.40 $ Lakeview Rd 2.00 $ Pikes Peak Rd 0.50 $ Schurch Rd* 0.60 $ Spring Creek Rd 1.40 $ Mounds Park Rd 1.20 $ *Indicates a dead-end road; a cul-desac/turnaround requires a sealcoat. Chip sealing work shall occur only when pavement and air temperatures are 60 F, or higher, and rising with no rain forecasted before curing occurs. Surface Preparation and Application: Immediately prior to applying the asphalt material, the entire existing surface shall be thoroughly cleaned of all loose dust, vegetation, and other objectionable material. Surface holes and frost dips shall be hard patched. Chip Seal Asphalt: Contractor to furnish PG 58-28 5% Cutback Liquid Asphalt. Chip Seal Aggregate: To haul, place, and roll 3/8-inch fractured pea stone cover aggregate and Furnish all machinery, labor, and other necessary incidentals to properly clean, seal coat, and roll various Town roads. 8. Traffic Control: Shall be responsible for all temporary traffic control. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |