Similar Projects
Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Brighton Dale Sewer Main - Parks-13 - Kenosha County
Infrastructure
Conception
$300,000 CJ est. value
Kansasville, WI 53139

Case High School 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$31,268,754 CJ est. value
Racine, WI 53403

Knapp Elementary School - 2020 Bond - Racine Unified School District
Infrastructure, Renovation
Design
$201,000 CJ est. value
Racine, WI 53403

42-inch Transmission Water Main Phase 3 Mound Avenue to Main Street
Infrastructure
Bidding
$17,000,000 CJ est. value
Racine, WI 53403

Shared Operations Facility Richard Bong Recreation Area
New Construction, Infrastructure - 4,700 SF
Bidding
$248,150 CJ est. value
Kansasville, WI 53139

Waterford Ten Club Park Building
New Construction - 3,559 SF
Post-Bid
$1,500,000 est. value
Waterford, WI 53185

Caledonia Public Safety Building
New Construction, Infrastructure - 50,000 SF
Post-Bid
$606,000 CJ est. value
Racine, WI 53403

Lift Station Nos. 1, 2, 3 and 4 Improvements
Demolition, New Construction, Infrastructure
Results
$3,986,000 CJ est. value
Dover, WI 53139

2022 Roadway Improvements
Infrastructure
Results
$674,320 CJ est. value
Waterford, WI 53185

Buildings 1 and 2 of the Waterford Lofts Project
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Waterford, WI 53185

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

North Beach Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Racine, WI 53402

Highway 20 Water Main - West Boulevard to Marquette (Department Of Transportation) - City of Racine
Infrastructure
Conception
$1,000,000 CJ est. value
Racine, WI 53403

Last Updated 01/04/2024 11:03 PM
Project Title

Shared Operations Facility - GPC

Physical Address View project details and contacts
City, State (County) Kansasville, WI 53139   (Racine County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,576,300 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's 20 prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state 21 building projects no longer apply. These changes take effect for projects advertised for bid after 22 September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. In general, the work consists of constructing a new shared use building at Richard Bong State Recreation Area, and the associated sitework. The shared use facility will consist of heated and unheated spaces for both the Bureau of Fisheries Management and the Bureau of Wildlife Management.

Details

1 Story Above Grade, 4,700 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents