Similar Projects
2022 Bond - Columbus City Schools
Renovation
Conception
$680,000,000 est. value
Columbus, OH

School Facilities Projects Phase 2
New Construction - 400,000 SF
Design
Less than $250,000,000 est. value
Gahanna, OH

Addition to Career Academy South-Western City School
Renovation
Bidding
$5,700,000 est. value
Grove City, OH 43123

Renovations to South High School-Phase 5
Renovation
Bidding
$2,500,000 est. value
Westerville, OH 43081

Phase 2 of Its Master Facilities Project
Renovation
Post-Bid
Gahanna, OH

Historic Building Project
Renovation
Post-Bid
Gahanna, OH 43230

Gahanna-Jefferson Public School District Restroom Renovation Project
Renovation
Results
Less than $261,134 est. value
Gahanna, OH 43230

Westerville North High School Restroom Renovations
Renovation
Results
Less than $202,100 est. value
Westerville, OH 43081

Jackson Middle School Additions and Renovations
Renovation, Addition - 13,931 SF
Construction
$4,300,000 est. value
Grove City, OH 43123

Westerville South High School - Phase 4 Loose Furnishings
Renovation
Post-Bid
$175,000 est. value
Westerville, OH 43081

Renovations to South High School-Phase 2
Renovation
Results
Less than $4,752,500 est. value
Westerville, OH 43081

Tenant Improvements Project
Renovation
Post-Bid
$450,000 est. value
Columbus, Westerville, OH 43082

Construction Manager at Risk Phase 2 of the Master Facilities Project
New Construction - 400,000 SF
Results
Less than $250,000,000 est. value
Gahanna, OH

2022 Capital Improvements - Bid Package 1: Partial Early Learning Center (ELC) Renovation
Renovation
Post-Bid
$200,000 est. value
Westerville, OH 43081

Secured Entries-Phase 2 Project
Results
Less than $1,576,000 est. value
Westerville, OH

Last Updated 06/01/2022 11:39 PM
Project Title

Hayes Intermediate Addition

Physical Address View project details and contacts
City, State (County) Grove City, OH 43123   (Franklin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, Approximately 9,560 SF Addition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents