Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority
Infrastructure, Alteration
Conception
Less than $35,607,000 est. value
Detroit, MI 48209

Ford Road Plaza
New Construction, Infrastructure - 9,237 SF
Design
$2,500,000 CJ est. value
Garden City, MI 48135

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Playground Equipment for Cherry Hill and Ford Woods
Post-Bid
Dearborn, MI 48124

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

North Fishing Site Redevelopment
Results
Belleville, MI 48111

Hot Mix Asphalt Cold Milling and Resurfacing
Infrastructure
Design
$97,507,120 CJ est. value
Warren, MI 48093

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2020 Water Main Replacement Multiple Locations
Results
Grosse Ile, MI 48138

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

Replacement of Pavement and Water Mains
Results
$2,250,000 est. value
Allen Park, MI 48101

Mcduffy Park Construction
Renovation
Post-Bid
Detroit, MI

Impact Attenuating Surfacing for Playground Structures
Term Contract
Results
Livonia, MI

Joe Louis Greenway- Site Construction 2021
Infrastructure
Post-Bid
Detroit, MI

Last Updated 09/01/2022 04:33 PM
Project Title

Garden City Public Schools High School Baseball

Physical Address View project details and contacts
City, State (County) Garden City, MI 48135   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Landscape Architect
Owner View project details and contacts
Architect View project details and contacts
Description

TEC Report: 62712 Project Description: The Garden City Public School District's Board of Education is accepting Sealed Bids to provide baseball field improvements at Garden City High School. Proposed work includes site work, drainage, field construction, fencing, and dugout construction. Foresite Design, Inc. 3269 Coolidge Highway Berkley, MI 48072 (248) 547-7757 Bruce Lemons blemons@foresitedesign.com Questions addressed ONLY to Foresite Design during Bidding Period. Failure to follow instruction may lead to rejection of Bid. The Board of Education will not open, consider, nor accept a Bid received after the date and time specified. All late Bids will be unopened and made available to the respective Bidder for pick-up, at their sole cost and expense for a period of two (2) weeks. A Bid Bond executed by a Treasury listed surety company acceptable to the Garden City Public School System or a cashier's check in the amount of at least 5% of the sum of the Bid shall be submitted with any Bid. All Bids shall be firm for a period of ninety (90) days. Successful Bidders whose Bids are $50,000 or more will be required to furnish satisfactory Performance and Payments Bonds by a Treasury listed surety in the amount of 100% of their Bid. The cost of Bond(s) shall be included in each Bid. All materials and supplies incorporated and used in construction of the Work and becoming a permanent part of this Project will not be exempt from State Sales Tax and/or Use Tax. All required Sales Tax/Use Tax shall be included in the Bid price. Bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner and any employee of Bidder and any member of the Board of Education or the superintendent. Additionally, Bids shall be accompanied by a sworn and notarized statement for the Iran Economic Sanctions Act Affidavit of Compliance a sworn and notarized Criminal Background-Sex Offender Affidavit. Bids not accompanied with these sworn and notarized statements will not be accepted by the Board. The Garden City Public School System's Board of Education reserves the right to accept or reject any and all Bids, either in whole or in part, to waive any informalities or irregularities therein, or to award the contract to other than the contractor(s) submitting the best financial Bid (low bidder), in its sole and absolute discretion.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents