Similar Projects
Lighthouse Area Sewer Phase II
Infrastructure
Bidding
Tybee Island, GA

Bloomingdale Regional Utilities
New Construction
Post-Bid
Savannah, GA

Rockingham Farms Water and Sewer Extension
Infrastructure
Post-Bid
Savannah, GA

Prosperity Drive Water and Sewer Improvements
Results
Garden City, GA 31418

Landfill Leachate Pump and Hauling Services
Term Contract
Results
Savannah, GA 31401

Prosperity Drive, Water And Sanitary Extensions
Infrastructure, Alteration
Post-Bid
Garden City, Savannah, GA 31405

Bonnybridge Road Secondary Outfall Improvements
Results
Port Wentworth, GA 31407

Protective Coatings
Infrastructure
Post-Bid
Savannah, GA

Sewer Line Construction
Results
Tybee Island, GA

Lighthouse Area Sewer Project
Results
Tybee Island, GA

Sallie Mood Drive and Agonic Road Force Main Replacement Project Phase I
Results
Savannah, GA 31406

Hodgeville Booster Pump Station
New Construction
Results
GA

Central Avenue Lift Station Rehabilitation Project
Renovation
Results
Savannah, GA 31406

Manhole (Utility Access) Rings and Covers
Term Contract
Results
Savannah, GA

Lift Station 23 Upgrades and Force Main Replacement
Renovation, Infrastructure
Results
Savannah, GA

Reported 10/29/2021 12:00 AM
Project Title

Savannah Quarters Lift Station and Force Main

Physical Address View project details and contacts
City, State (County) Pooler, GA   (Chatham County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract will consist generally of the following: Master Lift Station with three 79.1 hp submersible pumps, 7,440 LF of 18” PVC force main installed by open cut, 1,007 LF of 18” RJ PVC force main installed by open cut, 4,776 LF of 18” FPVC force main installed by horizontal directional drill,1,493 LF of 18” FPVC force main installed in 24” FPVC casing by horizontal directional drill, and 110 LF of 18” FPVC force main installed in 24” steel casing by jack and bore.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents