Similar Projects
Orangewood Lakes Water System Improvements Project
Infrastructure
Bidding
New Port Richey, FL 34653

Reclaimed Water Transmission Main Caloosahatchee River Crossing
Infrastructure
Bidding
Cape Coral, FL 33990

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

Wauchula Hills Phase 6 Water and Sanitary Improvements
Results
$1,826,130 est. value
Wauchula, FL 33873

Hickory Head Valves and Actuators
Infrastructure
Bidding
The Villages, FL 32159

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

CR846 Water Main Replacement Project
Results
Less than $345,000 est. value
Immokalee, FL 34142

Indiantown Road Raw Water Main Crossing (W2011a)
Infrastructure
Bidding
Jupiter, FL 33458

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

Residential and Commercial Backflow Testing and Repairs
Term Contract
Results
Orlando, FL 32801

Last Updated 07/02/2021 11:29 AM
Project Title

Advanced Metering Infrastructure (AMI) System

Physical Address View project details and contacts
City, State (County) Sanford, FL   (Seminole County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and install all proposed components of a fully functioning Advanced Metering Infrastructure (AMI) system and replacement water meters. This includes all hardware and and software required to operate and maintain the AMI system. The project must include a training plan for the city that begins as soon as the AMI system is functional. Vendor must fully staff the project with experienced project management, installation, IT, and field auditing staff for the duration of the project.

Details

Division 33 - Utilities, Water Utility Distribution Equipment, Water Utility Metering.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents