Similar Projects
Storm Shelter Door Replacement for W.S. Neal High School
Alteration
Bidding
East Brewton, AL 36426

Window and Door Replacement at Randolph County AL 3 Campuses
Alteration
Bidding
Wadley, Wedowee, Woodland, AL 36276

Hoover City Schools Window Replacement
Post-Bid
Hoover, AL 35243

Window Replacements
Post-Bid
Phil Campbell, AL 35581

Wood Doors as Needed Basis
Results
Mobile, AL 36618

City Hall Exterior Abatement Project
Results
Less than $137,745 est. value
Tuscaloosa, AL 35401

Fire Doors Preventative Maintenance
Term Contract
Post-Bid
Mobile, AL 36602

Jefferson County Public Safety Center Security Lock And Door System
Results
Birmingham, AL 35203

IQC, Task 6, 2017 & 2018 CFP - Various Modifications at Four Developments
Post-Bid
Enterprise, AL

Warehouse Roll-Up Door Replacements - Hurricane Sally
Results
Mobile, AL 36602

Customer Service Drive Through
Post-Bid
Madison, AL 35758

Reese Phifer Hall Annex Window Replacement
Results
Less than $250,000 est. value
Tuscaloosa, AL 35404

Installation of Laminated Exterior Solar Window Film
Post-Bid
Huntsville, AL 35899

Replacement Glass Windows
Results
Mobile, AL

Window Replacement for Thomas Kilby Hall
Post-Bid
Montgomery, AL 36104

Reported 10/14/2021 12:00 AM
Project Title

GulfQuest Maritime Museum - Skylight Film Replacement

Physical Address View project details and contacts
City, State (County) Mobile, AL 36602   (Mobile County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Include all labor, materials, tools and equipment necessary to safely remove and replace the film on the topside of the skylight. The existing film (Johnson DN20EXT) shall be carefully removed so as not to scratch or damage the glass - without standing or leaning on the existing structure. It is the contractor's responsibility to install scaffolding or other structure / device which will allow the film to be removed and new film installed without putting any weight on the glass or the skylight structure. Once the existing film has been removed, the glass shall be cleaned with products approved by the manufacturer - ensuring that all of the film has been removed, including dirt,debris and any other type of residue. Prepare the glass and gaskets as per manufacturer's instructions. Protect gaskets, sealants and mullions. The contractor will then provide and install the new film (Johnson DN20EXT or pre-approved equal) to all glass surfaces on the topside of the skylight. Note that pre-quote approval for film substitution is required. The film shall be carefully installed over the entire glass surface, without any pinholes, thinspots, scratches, banding, tears, seams or bubbles. The edges shall be cut so that the film covers 100% of the exposed glass surface. The contractor shall be resposible for taking field measurements of the skylight panels and not rely on the accuracy of the attached drawings.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents