Similar Projects
RGH Air Condition Unit Replacement
Post-Bid
Laurel, MD 20707

Dust Collection Unit
Post-Bid
Andrews Air Force Base, MD 20762

Thurgood Marshall Library Cooling Tower Replacement
Results
Bowie, MD 20715

Recommissioning (ReCx) Repairs Building: BARC 052 Controls
Results
$25,000 to $100,000 est. value
Beltsville, MD 20705

BARC MCquay Range #2 Chiller
Post-Bid
Beltsville, MD 20705

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

HVAC System Replacement for the 6000- Series
Post-Bid
Greenbelt, MD 20770

Dust Collection Unit
Results
MD 20762

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

Senior Center HVAC Modification
Results
Bowie, MD 20716

Crisis HVAC Contractors
Term Contract
Post-Bid
$10,000,000 to $15,000,000 est. value
Lanham, MD

Temple Hills Depot HVAC Upgrades
Results
Temple Hills, MD 20748

Air Handling Unit at Skilled Trade Center
- 5,397 SF
Post-Bid
Temple Hills, MD 20748

Preventive Maintenance and Repair of HVAC Equipment at Cheltenham Youth Facility
Term Contract
Results
Cheltenham, MD 20623

HVAC Maintenance and Service
Term Contract
Post-Bid
Less than $50,000 est. value
Greenbelt, MD 20770

Reported 12/02/2021 12:00 AM
Project Title

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland - PHASE 2

Physical Address View project details and contacts
City, State (County) Suitland, MD   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

NMIC-1 Replace 4 chillers and controls/install chiller catwalks project: replacement of chiller system components is limited to the plant equipment and includes but is not limited to: - Chillers 1-4 - Associated pumps - Variable frequency drives - Associated instrumentation - Associated controls In addition, the project will require: - New variable frequency drives as required to replace and modernize the existing chilled water system within the central plant. - The replacement of HVAC controls for the entire building, including the replacement of existing Johnson Controls Metasys control system serving the entire facility including the central chiller plant. - The installation of new exterior rooftop catwalks, to provide maintenance and service to the new rooftop chillers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents