Similar Projects
Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

RFP for Stillwater Phase 1 Force Main Reuse Upsizing
New Construction
Post-Bid
Saint Augustine, FL

Sanitary Sewer Manhole Inspections and Rehabilitation
Results
Saint Augustine, FL 32085

Clean, Inspect, Video and Map Storm Water Systems in District Two
Results

The Crossroads Mixed-Use Community
New Construction - 340,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint Johns, FL 32259

The Preserve at Bannon Lakes
New Construction
Pending Verification
Saint Augustine, FL

Seabrook Village at Nocatee - Potable Water Main
New Construction
Post-Bid
Ponte Vedra, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

State Road 207 Water Main Extension - Phase 1
Results
Less than $4,700,000 est. value
Saint Augustine, FL 32084

Directional Boring Services
Term Contract
Results
Less than $500,000 est. value
Saint Augustine, FL 32084

FCX SAV Excavation
Results
Less than $1,000,000 est. value
FL

County Road 214 24-Inch Water Main (Water Plant Road to Allen Nease Road)
Results
Less than $500,000 est. value
FL

Countywide Pipe and Manhole Lining Renewal and Rehabilitation Services
Results
FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

SRF Main System Manhole Rehabilitation - Group 1
Results
$900,000 est. value
FL

Last Updated 07/26/2021 08:10 AM
Project Title

Players Club WRF to Sawgrass WRF Interconnects

Physical Address View project details and contacts
City, State (County) Ponte Vedra Beach, FL 32082   (Saint Johns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project requires the Contractor to furnish all labor, materials, equipment, and incidentals necessary to perform the Work described in the specifications and as shown on the drawings, including installation of approximately 4,000 linear feet of reclaimed water main and force main piping by open-cut, horizontal directional drill, and jack and bore methods, installation of valves and appurtenances, filling, grading, seeding, sodding and restoration of the site, sedimentation and erosion control, performance and materials testing and permitting.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents