Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

New Public Works Facilities
New Construction, Alteration
Post-Bid
$100,000 est. value
Swissvale, PA 15218

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Post-Bid
$4,038,319 CJ est. value
Reno, NV 89502

A and B Directional Drill Project
Infrastructure
Results
Pittsburgh, PA

Structure Demolition
Demolition, Infrastructure
Results
$25,000 est. value
Pittsburgh, PA 15235

Pittsburgh Airport Innovation Campus Site Development Phase 2 at Pittsburgh International Airport
Infrastructure
Construction
Pittsburgh, PA 15231

Castlegate Green / Mount Lebanon
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Pittsburgh, PA 15226

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Fairywood Industrial Development
New Construction, Infrastructure - 150,000 SF
Pending Verification
$7,000,000 CJ est. value
Pittsburgh, PA 15219

Mars Valencia Rd Culvert
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Pine Township, PA 15090

Apex Newbury Apartments
New Construction, Infrastructure - 353,591 SF
Design
$112,000,000 CJ est. value
Bridgeville, PA 15017

Rich Hill Road Pump Station Dimminutor Addition
Addition, Infrastructure
Post-Bid
Russellton, PA 15024

Last Updated 03/09/2023 03:33 PM
Project Title

Bruecken Pump Station Improvements - City of Pittsburg

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15206   (Allegheny County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bruecken Pump Station Improvements - Includes construction of a new pump station building with six new vertical turbine pumps capable of pumping up to a combined maximum capacity of 84.9 MGD, including motors, instrumentation, piping and valves. A new pump station building will be built through general, electrical, HVAC and plumbing contracts. As of March 9, 2023, the design firm has been selected. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents