Similar Projects
Detention Facility Fire Alarm Design-Build
Post-Bid
Hendersonville, NC 28791

Testing and Inspection of Fire Protection
Term Contract
Post-Bid
Cherokee, NC 28719

Carriage House Fire Alarm System
Results
Less than $250,000 est. value
Raleigh, NC 27600

Market Survey: The FAA is Seeking Interested Sources that are Capable of Design and Construction to Replace the Fire Detection and Annunciation Systems at Numerous Facilities Throughout the United States
Results
$3,000,000 to $5,000,000 est. value

Fire Extinguisher Maintenance
Post-Bid
Cherry Point, NC 28533

Southeast Raleigh Magnet High School Fire Alarm Replacement
Results
Less than $651,425 est. value
Raleigh, NC

Repair Fire Suppression Bldg. 51
Post-Bid
$100,000 to $250,000 est. value
Charlotte, NC 28208

S--Fire/Smoke Damper Inspection at the Charles George VAMC
Results
Asheville, NC 28805

DLA Fire Protection MATOC
Post-Bid
$100,000 to $125,000,000 est. value

Six Year Inspection and Testing of Fire and Smoke Dampers at RJ Blackley
Term Contract
Results
$15,320 est. value
Butner, NC

Weil Winfield Fire Alarm Replacement
Results
Greensboro, NC

Museum of History Security Alarm System Maintenance Contract
Term Contract
Results
$8,748 est. value
Raleigh, NC

Z--Fire Pump and Equipment Room
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Fire Extinguishers - Purchases and Maintenance
Results
Raleigh, NC

Fire Detection & Alarm System Glen Arden Elementary School
Results
Arden, NC

Last Updated 02/28/2019 11:06 AM
Project Title

Alter Fire Protection Waterlines

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to construct a new fire pump to support Bldgs. 43, 67 and 69: construction shall include, but may not be limited to: construction of a new fire pump house with an electric fire pump that will provide the required fire suppression flows for Bldgs 43, 67 and 69. Infrastructure improvements will include relocation of a gas service line, pavement removal and replacement, new concrete pavement, new water main connection, new fire main connections, new electrical service and capping of the existing fire protection line.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents