Permanent Flood Protection - Main Street Outlet Vault
Infrastructure
Post-Bid
$80,000 to $120,000 est. value
Valley City, ND

Permanent Flood Protection - Main Street Outlet Vault
Infrastructure
Post-Bid
$80,000 to $120,000 est. value
Valley City, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Grading; Salvaged Base Course; Hot Mix Asphalt; Storm Drain; Watermain; Sanitary Sewer; Curb and Gutter; Curb Ramps; Sidewalk
Infrastructure
Results
$1,500,001 to $2,000,000 est. value
Valley City, ND

RFP Construction Manager at Risk - Construction Manager at Risk (CMAR) Services for Valley City State University Athletic Complex
New Construction, Infrastructure
Construction
$2,300,000 CJ est. value
Valley City, ND 58072

Asphalt Concrete Crack Clean and Sealing
Infrastructure
Post-Bid
$125,000 est. value
Valley City, ND

Milling; Hot Mix Asphalt; Pavement Marking; Curb and Gutter; Curb Ramps and Sidewalk
Infrastructure
Results
$800,001 to $1,000,000 est. value
Valley City, ND

Emergency Clay Levee Removal
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Valley City, ND 58072

ND 1, JCT I94 N to JCT ND 26 (Dazey) and ND 32, JCT I94 N to JCT ND 38 (Hope) - Chip Seal Coat
Infrastructure
Results
$1,500,001 to $2,000,000 est. value

SEPA Industrial Park Rail Loop Expansion
Infrastructure
Post-Bid
$800,000 CJ est. value
Spiritwood, ND 58481

CMC 0207, 1.5 MI S of CMC 0232 N to -94 - Milling and Rap Hot Mix Asphalt Overlay
Infrastructure
Results
$1,500,001 to $2,000,000 est. value
ND

Mill and Overlay, and ADA Curb Ramps, Sub Cut
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Berea, ND 58072

Structure Rehabilitation, Aggregate Base Course, Hot Mix Asphalt, Curb and Gutter, Sidewalk, Pedestrian Railing and Incidentals
Demolition, New Construction, Infrastructure
Results
$2,309,156 CJ est. value
Valley City, ND 58072

Main Street Outlet Vault
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Valley City, ND 58072

Led Lighting Replacement
Infrastructure
Results
$1,255,638 CJ est. value
Valley City, ND 58072

Last Updated 04/18/2023 11:13 AM
Project Title

Concrete Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Valley City, ND 58072   (Barnes County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $345,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City County Health Parking Lot Improvements Furnishing of materials, labor, equipment and skill required for the construction of Concrete Parking Lot Improvements and incidental items in and for said City County Health District, as is more fully described and set forth in the plans and specifications therefore, which are now on file in the office of the KLJ Engineering, LLC. Bids shall be upon cash payment on the following estimated quantities and types of work: Contract Bond, 1 Lsum; Removal Of Concrete Pavement, 1561 SY; Common Excavation-waste, 260 CY; Aggregate Base Course CL 5, 471 Ton; 5.5in Reinf Concrete Pvmt, 1412 SY; Mobilization, 1 Lsum; Traffic Control, 1 Lsum; Thickened Edge Sidewalk Concrete, 74 SY; Epoxy Pvmt Mk Message (Grooved), 2 Ea; Epoxy Pvmt Mk 4in Line (Grooved), 1313 LF; Install Sign, 2 Ea; Fence And Bollard Removal And Installation, 1 Lsum. All bids are to be submitted on the basis of cash payment for the work and materials, and each bid shall be accompanied by a separate envelope containing the contractor's license and bid security. The bid security must be in a sum equal to five per cent (5%) of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety company authorized to do business in this state, conditioned that if the principal's bid be accepted and the contract awarded to the principal, the principal, within ten (10) days after notice of award, will execute and effect a contract in accordance with the terms of his bid and the bid bond as required by the laws of the State of Nmih Dakota and the regulations and determinations of the governing body. If a successful bidder does not execute a contract within ten (10) days allowed, the bidder's bond must be forfeited to the governing body and the project awarded to the next lowest responsible bidder. ND 12/22/2021 Section 00100 - Page 1 of 2 All bidders must be licensed for the full amount of the bid as required by Section 43 07 07 and 43-07-12 of the North Dakota Century Code. The successful Bidder will be required to furnish Contract Performance and Payment Bonds in the full amount of the contract. Contracts shall be awarded on the basis of the low bid submitted by a responsible and responsive bidder for the aggregate sum of all bid items. A single contract will be awarded for the work. All bids will be contained in a sealed envelope, as above provided; plainly marked showing that such envelope contains a bid for the above project. In addition, the bidder shall place upon the exterior of such envelope the following information: 1. The work covered by the bidder 2. The name of the bidder 3. Separate envelope containing bid bond and a copy of North Dakota Contractor's License or certificate of renewal. 4. Acknowledgement of the Addenda. No Bid will be read or considered which does not fully comply with the above provisions as to Bond and licenses and any deficient Bid submitted will be resealed and returned to the Bidder immediately. The Owner reserves the right to reject any and all bids, to waive any informality in any bid, to hold all bids for a period not to exceed 60 days from the date of opening bids, and to accept the bid deemed most favorable to the interest of the Owner. Should the Contractor fail to complete the work within the time required herein or within such extra time as may have been granted by formal extensions of time approved by the Owner, there will be deducted from any amount due the Contractor the sum of $900 per day and every day that the completion of the work is delayed. The Contractor and his surety will be liable for any excess. Such payment will be as and for liquidated damages. The work on the improvement will be completed by September 30 th, 2023. Questions received less than ten days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents