Similar Projects
3rd Street Residential Development
New Construction, Infrastructure
Design
$17,365,000 CJ est. value
San Francisco, CA 94124

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

RFQ Construction Manager - SFMTA Parking Enforcement Headquarters Project
LEED Certification, New Construction, Infrastructure
Bidding
$48,000,000 CJ est. value
San Francisco, CA 94102

PW Various Locations Curb Ramp and Sub-Sidewalk Basements FY 21-22 (Package 1 - Grant / Clay and Sutter / Stockton)
Infrastructure
Bidding
$1,100,000 CJ est. value
San Francisco, CA 94103

160 Freelon Street - Early DESIGN BUILD Trades
New Construction, Infrastructure - 102,000 SF
Sub-Bidding
$10,000,000 CJ est. value
San Francisco, CA 94107

RFP D/B - San Francisco Municipal Transportation Agency (SFTMA) Potrero Yard Modernization Project
New Construction, Renovation, Infrastructure
Post-Bid
$311,500,000 CJ est. value
San Francisco, CA 94110

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

Howard Street Mixed-Use
New Construction, Infrastructure - 117,400 SF
Construction
$20,000,000 CJ est. value
San Francisco, CA 94103

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

California Campus - San Francisco University High School
Demolition, New Construction, Infrastructure - 47,000 SF
Pending Verification
$88,000,000 CJ est. value
San Francisco, CA 94115

Sutter Street Mixed-Use
New Construction, Infrastructure - 15,853 SF
Design
$7,000,000 CJ est. value
San Francisco, CA 94109

SFRPD CON23-0003 MULTI-SITE CHILDRENS PLAYGROUND REPAIRS PROJECT
Demolition, Build-out, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
San Francisco, CA 94134

AT T Mobility, LLC Install New Wireless Telecommunications Antennas
Alteration
Post-Bid
San Francisco, CA 94109

Last Updated 09/21/2022 10:12 AM
Project Title

Laguna Honda Hospital And Rehabilitation Center Main Sewer Replacement

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94116   (San Francisco County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $848,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Laguna Honda Hospital and Rehabilitation Center is located at 375 Laguna Honda Boulevard in the Forest Hills Extension neighborhood of San Francisco. The Laguna Honda Hospital and Rehabilitation Center Main Sewer Replacement Project proposes to construct new sewer mains to replace an aging and dilapidated sewer system on the campus. The project scope includes construction of 1,348 LF of 12-inch diameter VCP main sewer, new manholes, new storm drain laterals, and new sewer laterals. The project is largely limited to the roadway area on the Southside of the property; however a new sewer connection and manhole is proposed within the public right-of-way on Laguna Honda Boulevard, North of the Woodside Avenue intersection. The work also includes reconstruction of asphalt and concrete pavement, curb and gutter, concrete sidewalk, and landscape restoration. CONTRACT DURATION: 116 consecutive calendar days from NTP to Substantial Completion. REQUIREMENTS: 1) Class "A" license required to bid. 2) Pursuant to San Francisco Administrative Code ("Administrative Code") Section 6.25 and Chapter 25 of the Environment Code, "Clean Construction" is required for the performance of all work. 3) Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. 4) LBE Subcontracting Participation Requirement is 20% LBE. 5) Good Faith Efforts. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE subcontracting participation requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders will receive 15 points for attending the pre-bid conference. 6) For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com 7) This Project shall incorporate the required partnering elements for Partnering Level 1. Refer to Section 01 31 33 for more details. 8.1% MBE; 2.6% WBE; 9.3% OBE

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents