Similar Projects
Drummond Island-Phase II- Drummond Island Elementary
Renovation
Bidding
De Tour Village, MI

Alpena Public Schools 2020 Bond Project: Series 1 - Phase 2 - Bid Package #3, Sanborn Elementary, Hinks Elementary, Thunder Bay Junior High
Renovation
Bidding
Alpena, MI

Sinking Fund Series 4
Post-Bid
Athens, MI 49011

Sinking Fund Series 4
Post-Bid
Athens, MI 49011

Au Gres-Sims School District - K-12 Building Remodeling
Renovation, Addition
Results
Au Gres, MI

Media Center Renovations
Renovation
Results
Less than $207,702 est. value
Oak Park, MI 48237

Arts and Athletic Center
New Construction - 74,000 SF
Construction
Berrien Springs, MI

Ojibwe Charter School - High School Addition and Renovations
Renovation, Addition
Construction
$3,349,000 est. value
Brimley, MI 49715

Foundation for Behavioral Resources - Charter School
Renovation - 39,194 SF
Bidding
Battle Creek, MI 49014

Douglas Elementary School
Post-Bid
Saugatuck, MI

Coldwater High School Locker Room Renovations
Renovation
Results
Coldwater, MI 49036

2 Elem School Remote/Portable Classrooms
Renovation
Bidding

Plainwell Middle School Academic Improvements BP 2
Post-Bid
Plainwell, MI 49080

Disaster Recovery Services
Results

Delton Kellogg Schools- New Addition And Remodeling Project
Addition
Bidding
Delton, MI

Reported 01/21/2022 12:00 AM
Project Title

2022 Series II Upgrades

Physical Address View project details and contacts
City, State (County) Reading, MI 49274   (Hillsdale County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 12/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

Project 1 (Reynolds Elementary, Head Start and Day Care Building). Project 1 includes: removal and replacement of exterior windows and doors at all 3 buildings, removal of the existing steam heating system and replacement with a hot water boiler system at Reynolds, as well as removal and replacement of miscellaneous heating equipment at the Head Start building. Project 2 (Owens High School). Project 2 includes: removal and replacement of exterior windows and doors at Owen’s High school, toilet room renovations, and renovation of the existing locker and shower rooms.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents