Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Monona Terrace Loading Dock and Parking Area Repair
Infrastructure
Post-Bid
Madison, WI

Boardwalk Replacement
Results
De Forest, WI 53532

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Pending Verification
Fitchburg, WI 53711

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

Spring Green - Madison, Walter Road
Results
WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Hubbard Avenue, Mayflower Drive, Violet Place, Orchid Lane Reconstruction
Results
Less than $2,472,200 est. value
Middleton, WI 53562

Parking Lots, Curbs, and Exterior Lighting - MEP
Results
$570,000 est. value
Madison, WI 53718

Parking Lots, Curbs, and Exterior Lighting - General
Results
$570,000 est. value
Madison, WI 53718

2021 CTH MN/Broadhead Street Utility and Street Improvements
Results
McFarland, WI 53558

Resurfacing 2021 - Curb, Gutter and Castings
Results
$900,000 est. value
Madison, WI 53787

Village of Dane Southeast Public Works Loop
Results
Dane, WI

Chicory Way, Juniper Street and Aspen Place Reconstruction
Results
$25,000,000 est. value
Sun Prairie, WI

Reported 10/08/2021 12:00 AM
Project Title

Concrete Sidewalk at Warner Park Community Recreation Center

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 09/16/21
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of replacing an existing concrete paver area with concrete walk at the main entrance to the Warner Park Community Recreation Center, 1625 Northport Dr., Madison, WI. The Center will be open for standard hours of operation during construction. The Contractor shall maintain public access to the main entrance of the facility during all construction operations, and ensure a safe, clearly defined path of entry is provided.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents