Similar Projects
USMC PFC D Marshall Mem Br
Demolition, New Construction, Infrastructure
Design
$6,110,000 CJ est. value
Mineral Wells, WV 26150

Williamson RR OP
Infrastructure
Design
$1,400,000 est. value
Myrtle, WV

Beaver - S Eisenhower Dr
Infrastructure
Bidding
$72,000,000 CJ est. value
Beckley, WV 25801

Morris Lane Bridge Replacement - Kanawha County
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Cedar Grove, WV 25039

Stevens Drive Road Replacement
Infrastructure
Post-Bid
Dunbar, WV 25064

Bridge Deck Replacement
Renovation, Infrastructure
Post-Bid
$600,000 est. value
Charleston, WV 25330

Guardrail - Servia-Burnsville Rdd
Infrastructure
Results
Burnsville, WV 26335

CO 9 OP Bridges
New Construction, Infrastructure
Results
WV

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

Huff Bridge
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Pine Grove, WV 26419

Structure Replacement - Evitts Creek BR/Bloomery
Demolition, New Construction, Infrastructure
Bidding
$1,258,000 CJ est. value
Ranson, WV 25438

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Larry Hacker Memorial Bridge
New Construction, Infrastructure
Results
WV

Heath Creek Slab +2
New Construction
Design
$960,000 est. value
Barboursville, WV 25504

Const New/reloc 2 Lane Road W/bridge(S) - Big Tribble Bridge
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Moundsville, WV 26041

Last Updated 05/02/2023 02:32 AM
Project Title

Burnsville I/c Bridges

Physical Address View project details and contacts
City, State (County) Sutton, WV 26601   (Braxton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type of Work :C&p As of March 28, 2023, the project is in final planning status. The funding obligation date for the construction is October 28, 2023. WVDOT - Burnsville I/c Bridges *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents