Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

New Elementary School
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
De Kalb, MS 39328

Fisher Road Overlay Project
Infrastructure
Bidding
$100,000 est. value
Winona, MS 38967

Bldg. 28 Canopy & Slab
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Leland, MS 38756

Annual Full Depth Reclamation
Post-Bid
Southaven, MS

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Mill and Overlay
Results
MS

Intersection Improvements at Various Locations Throughout the District 6
Infrastructure
Results
MS

Lumberton Sawmill
New Construction
Construction
$120,000,000 est. value
Lumberton, MS 39455

Lockers Manufacturing
Renovation - 62,000 SF
Pending Verification
$5,350,000 est. value
Batesville, MS

Milwaukee Tool - Grenada
New Construction - 500,000 SF
Pending Verification
$60,000,000 est. value
Grenada, MS

Sanitary and Storm Sewer Rehabilitation Annual Contract
Infrastructure
Bidding
$420,000 CJ est. value
Meridian, MS 39301

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Andrew Chapel Road Reconstruction
Results
$3,700,000 est. value
MS 22554

Kohler Engines - Hattiesburg
Addition
Pending Verification
$6,000,000 est. value
Hattiesburg, MS 39401

Last Updated 07/26/2022 04:01 PM
Project Title

Velocys Bayou Fuels Project - Belwood Industrial Park

Physical Address View project details and contacts
City, State (County) Natchez, MS 39120   (Adams County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new bio-refinery plant that would specialize in the production of environmentally friendly jet fuel. Further scope has not been released. As of July 2022, Pre-FEED and federal permitting completed. It has yet to be determined what approvals have been obtained through Adams County Board of Supervisors. Information regarding the selection of an architect and general contractor has not been provided. Construction is tentatively scheduled to begin in in early 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents