Similar Projects
V Kimberly - Cth N Const Ops / Misc HSIP
Infrastructure
Conception
$2,000,000 CJ est. value
Kaukauna, WI 54130

V Kimberly - Cth N Const Ops / Misc HSIP
Infrastructure
Conception
$2,000,000 CJ est. value
Kaukauna, WI 54130

T. Grand Chute, College Ave Des-Bld / BRRPL
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Appleton, WI 54914

T. Grand Chute, College Ave Des-Bld / BRRPL
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Appleton, WI 54914

Restroom Building at Plamann Park
New Construction, Infrastructure
Bidding
$376,982 CJ est. value
Appleton, WI 54913

New Trail Minor Block Retaining Wall Miscellaneous Grading and Riprapping Restoration
Alteration
Post-Bid
WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Pavement Maintenance
Term Contract
Results
Appleton, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Appleton Public Library Construction/Renovation BU 32C Landscaping / Irrigation
New Construction, Infrastructure - 120,000 SF
Pending Verification
$4,531,723 CJ est. value
Appleton, WI 54911

Kwik Trip #887 Building Addition / Grand Chute
Addition, Demolition, Infrastructure - 1,463 SF
Pending Verification
$400,000 CJ est. value
Appleton, WI 54913

T Grand Chute - V Little Chute Const / Misc Hsip Intersection Mod
Infrastructure
Conception
$750,000 CJ est. value
Freedom, WI 54913

Pine Street Pedestrian Mall & Parking Lot
Infrastructure
Post-Bid
$400,000 est. value
Little Chute, WI

Last Updated 10/28/2022 12:36 AM
Project Title

Lawrence University - Whiting Field Phase 1 - Track and Field Site Redevelopment Project

Physical Address View project details and contacts
City, State (County) Appleton, WI 54915   (Outagamie County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Athletic Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 23, 2022 bids were canceled. No definite date for the rebid. Sidewalks/Curbs/Gutters, Retaining Walls, Concrete/Formed/Flatwork/Foundation, Buildings and Grounds/Athletic/Sports Facilities, Concrete Pavement, Electrical Installation/Construction, Fencing/Guardrails/Handrails, Excavation, Stormwater Improvements, Irrigation, Landscaping - Seeding, Erosion Control - Temporary, Electrical, Paving (Asphalt or Concrete), Parks, Recreation, Athletic & Aquatic Facilities, Directional Drilling, Sitework/Excavating and Grading, Grubbing & Clearing Description: The work, for which bids are asked, generally includes the following: CONTRACT "A" - GENERAL SITE CONSTRUCTION 1. Running Track and Athletic Field Improvements including stripping topsoil, placing and screening topsoil, earthwork, erosion control, dense graded base, concrete flatwork, storm sewer, asphalt pavement, irrigation, fencing, seeding, sodding, restoration and athletic equipment. 2. Alternate Bids as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "A, ALTERNATE A1" - REVISED MILESTONE COMPLETION DATES 1. State the amount to be deducted to the base bid with the extended milestone completion dates as indicated in the specifications. 2. All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "B" - ELECTRICAL SITE CONSTRUCTION 1. Electrical construction for the site with work including, but not limited to, service, conduits, panels, switches, receptacles, outlets, light fixtures, wiring, re-wiring, site lighting, athletic lighting, excavation, backfilling, compaction, concrete bases, disposal of excess material, and utility coordination. 2. Alternate Bids as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "B, ALTERNATE B1" - PRESS BOX ELECTRICAL & TELECOMMUNICATIONS 1. State the amount to be added to the base bid to provide electrical and telecommunications to press box as indicated on the drawings and in the specifications. 2. All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "B, ALTERNATE B2" - REVISED MILESTONE COMPLETION DATES 1. State the amount to be deducted to the base bid with the extended milestone completion dates as indicated in the specifications. 2. All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR'S bid. WORK BY OTHERS Work by others or OWNER that shall be concurrent to work of this contract includes the following: 1. Contract "C" - GRANDSTANDS - Providing and installing grandstands will be procured under a separate bidding process. Work of these contracts shall be coordinated with grandstand construction. 2. Contract "D" - TRACK SURFACING - Providing and installing track surfacing system will be procured under a separate bidding process. Work of these contracts shall be coordinated with track surfacing construction.

Details

Park/Playground, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents