Similar Projects
American Village Independence Hall and Congress Hall Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Montevallo, AL 35115

Intersection Improvements (Concrete Pavement) on SR-3 (US-31) at SR-25
Infrastructure
Bidding
$227,303 CJ est. value
Calera, AL 35040

2022 City Park Lighting Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Pelham, AL 35124

Parking Lot Striping
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Alabaster, AL 35007

Copper Tubing PVC Pipe
Post-Bid
Columbiana, AL

Water Fittings and Accessories
Term Contract
Post-Bid
Columbiana, AL

Intersection Realignment and Traffic Signal Installation
Results
Chelsea, AL

Paving and Resurfacing Project
Results
AL

Shelby Ridge WRF Improvements
New Construction, Infrastructure
Bidding
$8,270,000 CJ est. value
Chelsea, AL 35043

2021 Water Main Rehabilitations and Extensions
Post-Bid
Alabaster, AL

Paving and Resurfacing 2021
Results
Columbiana, AL

Montevallo Water Treatment Plant - Residential and Commercial Water Meters
Infrastructure
Bidding
$70,000 est. value
Montevallo, AL

2021 AMR System - Meters and Assessories
Infrastructure
Post-Bid
Pelham, AL

Parking Lot Improvements to Creekview Elementary School
Results
Alabaster, AL 35114

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

Last Updated 07/28/2022 12:10 PM
Project Title

Appleford Sidewalk Repairs

Physical Address View project details and contacts
City, State (County) Helena, AL 35080   (Shelby County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $50,390 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing the Following: All Labor, Materials, Equipment, Services and Incidentals for the Sidewalk Repairs in the Appleford Subdivision as Outlined in These Bidding Documents. The Principal Items of Work Are: * Approximately 148 Square Yards of Removal and Replacement of 4" Thick Concrete Sidewalk at 32 Sites * Approximately 78 Linear Feet of Sidewalk Joint Grinding at 19 Sites * Approximately 21 Linear Feet of Removal and Replacement of Concrete Valley Gutter at 1 Site All Bids Shall Be Lump Sum. Technical Questions About the Work or Project Should Be Directed in Writing to Sammy.harton@greshamsmith.com. A Cashier's Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000.00) and Made Payable to the City of Helena Must Accompany Each Bid as Evidence of Good Faith. In Accordance With Section 34-8-8. Code of Alabama as Amended, "All Owners, Architects, and Engineers Receiving Bids Pursuant to This Chapter Shall Require the Person, Firm or Corporation to Include His or Her Current License Number on the Bid." It Also States That " It Will Be Necessary for Him or Her to Show Evidence of License Before His or Her Bid Is Considered." No Bids Will Be Considered Unless the Bidder, Whether Resident or Nonresident of Alabama, Is Properly Licnensed and Qualified to Perform the Work Described Herein in Accordance With All Applicable Laws of the State of Alabama. This Shall Include Evidence of Holding a Current Certificate to Engage in General Contracting in the State of Alabama, Issued by the State of Alabama Licensing Board for General Contractors, Montgomery, Alabama, as Required by Section 34-8-2, Code of Alabama (1975). Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Suncontractors, Prior to Beginning Work. This Is a City-funded Project Through the City of Helena. Site Directions: Starting from the intersection of SR-261 and CR-52 head west on CR-52 approximately 0.75 miles then turn right on Hillsboro Parkway. Proceed and turn right on Appleford Rd in 0.11 miles. The Propsed Work Shall Be Performed in Comformity With All Applicable Laws, Rules, and Regulations. All Work Shall Be Completed in Accordance With the Plans for This Project and the Alabama Department of Transportation (Aldot): * Applicable Standard Specifications for Highway Construction, 2022 Edition, * Applicable Standard and Special Drawings for Highway Construction, 2022 Edition, the Right to Reject Any or All Bids Is Reserved. Bid Documents Are Also on File at the Following Locations: Gresham Smith, 3595 Grandview Parkway, Suite 300, Birmingham, Al 35243 the Deadline for Submitting Questions Is Thursday, June 30, 2022 at 5:00 P.m. All Questions Must Be Submitted in Writing and Can Be E-mailed to Sammy.harton@greshamsmith.com. No Questions Will Be Accepted After This Time. Bid opening date has been changed to July 20, 2022 at 1:00PM. ii. Deadline for Bidder question has been changed to July 13, 2022 at 5:00PM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents