Similar Projects
Heat Treat Services
Bidding
CO

HVAC - CRAC Re-Acq
Post-Bid
Colorado Springs, CO 80916

HVAC-CRAC ReAcq Synopsis
Post-Bid
$50,000 to $9,990,000 est. value
Colorado Springs, CO 80914

Sustain Repair Air Handler Units - West Fairchild Hall
Results
$1,000,000 to $5,000,000 est. value
Black Forest, CO 80840

Cooling Tower Repairs and Renovations
Results
Less than $50,000 est. value
Colorado Springs, CO 80906

Replace Rooftop Air Condenser Unit
Post-Bid
Colorado Springs, CO

CM Engineering and Applied Science Building Chiller Plant Upgrades
Results
Colorado Springs, CO 80918

Building 1840 Computer Room Air Conditioner (CRAC) Replacement
Post-Bid
Colorado Springs, CO 80916

Centennial Hall HVAC Upgrade
Results
Colorado Springs, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Blast Booth, Media Reclaim System, and Dust Collection System Cleaning
Results
Colorado Springs, CO 80914

Pioneers Museum Offsite Storage HVAC Upgrade
Post-Bid
Colorado Springs, CO 80903

Repair Chemical Feeders for Heating and Chilled Water Systems
Results
Colorado Springs, CO 80914

Improvements to the HVAC System Windows and Indoor Air Quality Berg Building
Post-Bid
Less than $1,417,414 est. value
Colorado Springs, CO 80900

Cooling Tower Blanket Contractor Repair Services
Term Contract
Results
Colorado Springs, CO 80903

Last Updated 10/14/2020 11:13 AM
Project Title

Repair HVAC Harmon Hall Arnold Hall

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80840   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair HVAC - Arnold Hall and Harmon Hall: Chilled water that is generated at Harmon Hall is supplied to Harmon Hall, Arnold Hall and Polaris Hall. Cooling towers are located on Arnold Hall roof which is piped vertically and through tunnels to Harmon Hall. Harmon Hall HVAC system consists of water cooled heat pumps which reject heat to the chilled water system via heat exchangers located in the basement of Harmon Hall. This project will replace the cooling towers located on the roof of Arnold Hall. The cooling heat exchangers at Harmon Hall will be upgraded to flat-plate type and various piping and controls will be upgraded. A temporary air cooled chiller will be utilized during cooling tower demo and replacement. Hazardous material testing was performed and results are included with project documents. General Description: •a) Demo and replace cooling towers on Arnold Hall roof, including roof and structural work, except Siemens DDC. •b) Provide Siemens DDC which is required for facilitating work. •c) Repair HVAC located at Arnold Hall and not on the roof. •d) Repair HVAC located at Harmon Hall, including 200-ton temporary air cooled chiller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents