Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Cascade, ID 83611

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

For the Work of Performing Preventative Pavement Maintenance on All State Roads in Power County
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Results
ID

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Engineering Services for Design Of Worley Minor Streets Repair Phase 2
Infrastructure
Results
Worley, ID 83876

SH-27 Road Rehabilitation, Burley CL to JCT I-84
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Last Updated 06/21/2022 03:52 AM
Project Title

2022 Sewer Improvements

Physical Address View project details and contacts
City, State (County) Rigby, ID   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $169,836
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing approximately 370 feet of 8" sewer line and 285 feet of 10" sewer line by open trench, extending and reconnecting service lines, surface restoration; asphalt and concrete curb and gutter, replacing manholes and collars.

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents