Similar Projects
Forbes Regional Hospital Hybrid Operating Room
Renovation
Design
Monroeville, PA 15146

West Penn Hospital Master Plan - Hospital Inpatient Care
New Construction - 450,000 SF
Design
$10,000,000 CJ est. value
Pittsburgh, PA 15224

Z1dz--Renovate Laundry Room / Install New Laundry Equipment Project # 503-20-109
Renovation
Post-Bid
$25,000 to $100,000 est. value
Pittsburgh, PA

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

Renovate Prosthetics at HZ
Renovation
Results
Pittsburgh, PA 15215

Jefferson Hospital Emergency Department
Addition - 34,000 SF
Construction
$21,000,000 est. value
Jefferson Hills, PA 15025

Brentwood Micro-Hospital
New Construction - 36,000 SF
Construction
$25,000,000 est. value
Pittsburgh, PA 15220

West Penn Hospital Master Plan - Hospital Infill Inpatient Care
New Construction - 100,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15224

Y--Construction
Results
$20,000 to $50,000 est. value
Pittsburgh, PA 15240

McCandless - Small Format Hospital
New Construction - 40,000 SF
Construction
$25,000,000 est. value
Pittsburgh, PA 15237

UPMC PUH 4D Infill AHU Replacement
Renovation
Construction
$147,000 est. value
Pittsburgh, PA 15213

Hospital Lobby Addition
Addition
Construction
Monroeville, PA 15146

West Penn Hospital
Renovation - 616 SF
Construction
$420,000 est. value
Pittsburgh, PA 15224

AHN Wexford Acute Care Hospital
New Construction - 345,000 SF
Construction
Wexford, PA 15090

UPMC Montefiore
Renovation - 136,500 SF
Construction
$700,000 est. value
Pittsburgh, PA 15213

Reported 11/19/2020 11:50 AM
Project Title

Magee Hospital Emergency Power Upgrades/Generator Building Addition

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15213   (Allegheny County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method
Project Status Construction Commenced January 2021
Bids Due View project details and contacts
Estimated Value $2,715,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hospital, 3 Stories Above Grade, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames.
Division 09 - Finishes, Plaster and Gypsum Board, Flooring, Resilient Flooring, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents