Similar Projects
Last Updated | 02/13/2019 06:06 AM |
Project Title | Sweetheart Trail - Sickler Drive |
Physical Address | View project details and contacts |
City, State (County) | Daytona Beach, FL (Volusia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of a 12-foot wide concrete trail approximately 343 feet (0.065 miles) in length. The trail will run along the north side of Sickler Drive, which transitions to the northeast side of Riverside Dr/N Beach St terminating at the intersection of 2nd St and Riverside Dr. The project includes: excavation, embankment, clearing and grubbing, sodding, sign relocation, drainage improvements and installation of concrete curb, curb ramps, concrete driveway with 6-inch concrete and detectable warning surfaces. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |