Similar Projects
Multiyear High and Low Pressure Boilers
Renovation
Sub-Bidding
$800,000 CJ est. value
New York, NY 10007

Repairs of Freezer and Refrigerators
Renovation
Sub-Bidding
$40,000 CJ est. value
New York, NY 10031

Vladeck II Houses Roofing Replacement and Rooftop Structure
Alteration
Post-Bid
New York, NY 10002

Roofing Replacement and Rooftop Structure at Vladeck Houses
Alteration
Post-Bid
New York, NY 10002

Cleaning of HVAC Systems and Associated Ductwork Services
Term Contract, Alteration
Results
New York, NY

Rehabilitate Elevators, Buildings 4 and 5 - HVAC
Infrastructure
Results
$50,000 to $100,000 est. value
New York, NY 10033

On-call services of Air Handling Control Systems
Term Contract
Sub-Bidding
New York, NY 10007

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Repair and Replace of Heating Pipe and Mechanical Equip Insulation - Citywide
Alteration
Results
New York, NY 10065

HVAC Equipment Replacement at Three United Nations Plaza
Renovation
Sub-Bidding
$400,000 CJ est. value
New York, NY 10007

HVAC Systems and Associated Ductwork Services & Inspections
Term Contract
Post-Bid
New York, NY

Boiler Tube Replacement Services
Alteration
Results
New York, NY

Preventive Maintenance Repair / Replacement of HVAC Systems and Parts
Term Contract, Alteration
Post-Bid
New York, NY

Kaye Playhouse Rooftop AHU Replacement and Asbestos Abatement
Alteration
Results
New York, NY

SMD Services the Repair, Alteration and Installation of Range Hood Fire Suppression Systems Located at Various Developments Within the Five (5) Boroughs of New York City
Term Contract, Alteration
Post-Bid
Manhattan, NY

Last Updated 02/17/2023 09:39 AM
Project Title

Enhanced Ventilation Energy Recovery Ventilation

Physical Address View project details and contacts
City, State (County) New York, NY 10007   (New York County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2026
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Enhanced Ventilation Energy Recovery Ventilation RFQL 5217 sets up a mechanism to qualify Energy Recovery Ventilation (ERV) Manufacturers for eligibility to participate in the adoption of retrofit enhanced ventilation projects, where NYSERDA plans to cost-share support for design and integration of ERV+DOAS into existing commercial, industrial, and multifamily buildings through a Program expected in 2023. The RFQL describes a set of technical design specifications and consulting/advisory qualifications that will be assessed via application of required information and then formal evaluation interview. NYSERDA is seeking to qualify ERV Manufacturers that demonstrate the ability to meet the high efficiency ERV System Requirements. Manufacturers with high efficiency ERV products are invited to apply to this RFQL. Applicants must have prior demonstrable experience in high efficiency retrofit ERV projects. The Applicant must provide proof of capabilities through ERV project examples and product specifications / testing certificates. Potential vendors will be evaluated qualitatively and quantitatively on past ERV projects that have been implemented within thirty-six (36) months of submitting to this RFQL. Service-Disabled Veteran-Owned Set Aside: No Contract term: up to 5 years Location: Commercial, Multifamily and Industrial buildings in New York State. CR Number: 2095094

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents