Similar Projects
Last Updated | 04/07/2023 02:37 AM |
Project Title | Toledo WTP Permanganate Feed Lines Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Toledo, OH 43605 (Lucas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $4,646,801 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Type of Award Lump Sum Categories 91200 - Construction Services, General (Incl. Maintenance And Repair Services) 91300 - Construction Services, Heavy (Incl. Maintenance And Repair Services) 91400 - Construction Services, Trade (New Construction) 91468 - Plumbing License Requirements Contractor's Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Local - Local Business Bid Valid 180 Days Liquidated Damages $1,000 / day Estimated Bid Value Start/Delivery Date Upon Issued PO Project Duration Standard one year contract duration Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 03/29/2023 5:00 PM (EST) The work to be performed under this Contract generally consists of the removal and replacement of the existing permanganate feed system piping at the Collins Park WTP Low Service Pumping Station, 1002 N. Yondota Rd, Curtice, Ohio. The work to be complete includes the removal of the existing 3-in HPDE piping including accessories and existing diffuser rings at the Intake Crib. The contractor will also reconfigure the process piping within the Surge Well and replace the filters and drain piping for the existing strainers in the Permanganate Building. The completed project will include the installation of three 3-in Steel Reinforced HDPE pipelines from the Surge Well to the Intake Crib, including associated mounting brackets and accessories. The approximate distance between the Surge Well and Intake Crib is 15,493 linear feet. The Contractor will be required to provide 48,807 linear feet of steel reinforced HDPE pipe and approximately 295 linear feet of stainless steel braided hose. City forms must be filled out and attached to the bid: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate); Signed Contract by Vendor CEO/President; Current Worker's Compensation Certificate; Insurance Certificate listing the city of Toledo as an additional insurer; and Child Support Affidavit. The following items will be required upon awarding the contract: Any additional Insurance or Bonding as Required. Deposit to guarantee bid. Please refer to the Bid Information tab of this bid for details. Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations. Current prevailing wage rates may be found on the Division of Purchases and Supplies site |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |