Similar Projects
Construction of Ductwork Modifications
Bidding
Greensboro, NC 27411

High Point Mental Health HVAC Renovations
Bidding
Greensboro, NC 27401

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

High Point Social Services Phase I - Unit AC 2
Post-Bid
High Point, NC 27260

AHU, VAV/DDVAV and Controls Upgrade - Phase 1 Dowdy Administration Building
Results
Greensboro, NC 27400

Southwest Guilford High School - HVAC Renovation
Results
High Point, NC

Northwest High Gym AC
Bidding
Greensboro, NC 27409

Diagnostic and Emergency Repair Services for Residential Dwellings
Term Contract
Post-Bid
High Point, NC

Chiller Internal Inspection
Results
Greensboro, NC

Dundas Circle HVAC Renovations
Post-Bid
Greensboro, NC 27407

Air Conditioner RTU
Results
Greensboro, NC

HVAC Maintenance and Repair Services
Post-Bid
High Point, NC 27260

HPRH Kitchen Hood Replacement
Results
High Point, NC 27262

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Greensboro Coliseum Complex Arena Cooling and Ice Floor Chiller Replacement Project
Results
Greensboro, NC

Last Updated 03/05/2019 11:54 AM
Project Title

Solicitation/RFO Announcement for the FAA Eastern Acquisition Service Area, Boston Acquisition Office, has a New Construction Requirement for the GSO ASR Fiber Optic Project in Greensboro, NC.

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Construct the fiber cable paths shown on Drawing Series GSO-D-1798021, Sheets R001 to R012. The first path, designated as Segment 1 begins at a manhole in the existing ductbank on the east side off IDB LOC, follows Taxiway H and Taxiway A and ends at the new GSO ASR site. The second path, designated as Segment 2 shall start at the GSO ASR and end at the GSO RTR. Segment 3 shall start on the east side of the RT shelter, follow Taxiway J and then extend north to the GSO ATCT. The new ductbank shall consist of 2 each 4" ducts along the entire length. The duct shall be concrete encased PVC or bored High Density Polyethylene conduit (HDPE). The top of the ducts shall be installed as shown on the duct profile drawings with a minimum of 33" below grade. Contractor shall install 3 each - 1 1/4" corrugated inner ducts (the inner ducts shall be three different colors) in each 4" duct. Contractor shall also install the fiber optic cable; conduct termination or testing where indicated on the drawings. The contractor shall provide all labor, equipment and materials to install the duct, inner duct, fiber optic cable, manholes and all other appurtenances as described herein or indicated on the drawings.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 40 - Process Integration, Process Control Hardware, Process Control Networks, Fiber Optic Process Control Networks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents