Similar Projects
Roof Restoration - Ice Arena - ICE022 - City of Novi
Alteration
Conception
$875,000 est. value
Novi, MI 48375

Roofing Removal and Replacement
Alteration
Design
$300,000 est. value
Flint, MI 48505

Station 4 Roof Replacement
Renovation
Sub-Bidding
$897,000 CJ est. value
Kalamazoo, MI 49007

Residential Roof Replacement
Renovation
Sub-Bidding
$38,485 CJ est. value
Bay City, MI 48708

2022 Traverse City Roof Replacement Projects
Alteration
Post-Bid
$200,000 est. value
Traverse City, MI

Administration Building Reroof
Alteration
Post-Bid
$180,000 est. value
Ludington, MI 49431

2022 Roof Replacements WWTP
Alteration
Results
$350,000 est. value
Lansing, MI 48951

2022 Roof Replacement Waste Water Treatment Plant - (WWTP)
Alteration
Results
$900,000 est. value
Lansing, MI 48917

Rozsa Center Roof Replacement
Renovation
Construction
$142,800 CJ est. value
Houghton, MI 49931

Removal and Replacement of Roofing on Storage Barn
Renovation
Construction
$16,755 CJ est. value
Bay City, MI 48708

Water Treatment Plant Garage Roofing Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Midland, MI 48642

2022 Roof Repair Program
Alteration
Post-Bid
$900,000 est. value
Saint Clair Shores, MI

DPW Steel Roofing Replacement 2022
Alteration
Results
$900,000 est. value
Wixom, MI

Governor Residential Roof Replacement
Renovation - 11,000 SF
Sub-Bidding
$250,000 CJ est. value
Lansing, MI 48911

New Genesee County Building Re-Roofing Project
Renovation
Post-Bid
$600,000 CJ est. value
Flint, MI 48502

Last Updated 10/20/2023 06:02 PM
Project Title

Metro Roof Replacement

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI 49007   (Kalamazoo County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $63,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The bond value requirements are as follows 1.Provide a 100 percent Performance Bond on AIA A312. 2 Provide a 100 percent Payment Bond on AIA A312. 3 Deliver bonds within 3 days after execution of the Contract. Liquidated Damages The Owner will suffer financial loss if the Project is not substantially complete on the date set forth in the Contract Documents. The Contractor and the Contractor's Surety, if any, shall be liable for and pay to the Owner the sums hereinafter stipulated as liquidated damages for each calendar day of delay until the Work is Substantially Complete Unit-Price Adjustment: See Division 01 Section Unit Prices for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured scope of unit-price work. Scope Removing select portions of the existing roof system, metal copings, flashing, roof hatch, and ladder and replacing with new tapered insulation, roof membrane, new safety roof hatch, safety ladders, roof access ladders, wood blocking, new roof edge metal. The project also consists of the lifting of one roof top mechanical unit to allow a new roof curb, roof and roof flashing below the unit. Several other roof top units and equipment are identified to be re-flashed and sealed watertight. Description Procurement Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Procurement and Contracting Documents, submitted prior to receipt of bids. Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe ite needing interpretation. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents. Requests received after that time may be considered or rejected at discretion of Architect. The deadline for completion is 120 days after Notice to Proceed. Questions about this IFB should be directed to: Department Contact: Rob Branch Deputy Director of Fleet and Facilities at branchr@kemetro.com, or (269) 337-8235

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents