Similar Projects
Reservoir System Monitoring
Post-Bid
Raleigh, NC 27632

Princeville Levee Repair Contract #1
Post-Bid
$5,000,000 to $10,000,000 est. value
Princeville, NC

Z--Project 659-19-117 (VA-19-00055), Halls & Flooring Multiple Campus Buildings
Renovation
Results
$500,000 to $1,000,000 est. value
Salisbury, NC 28144

Fabrication of Hydraulic Steel Structures for Falls and Jordan
Results
NC

Princeville Levee Repair Contract #2
Post-Bid
$10,000,000 to $25,000,000 est. value
Princeville, NC

Neuse River-Goldsboro Section 1135
Results
$5,000,000 to $10,000,000 est. value
Goldsboro, NC 27530

Construction of Devonwood Lower Dam
Post-Bid
Fayetteville, NC

USS NC Battleship Phase 2 Hull Repairs
Results
Less than $2,500,000 est. value
Wilmington, NC 28401

Dam Remote Valve Operation System
Post-Bid
Raleigh, NC

Levee Repairs - Princeville, North Carolina (Edgecombe County)
Results
$500,000 to $1,000,000 est. value
Princeville, NC

Dutch Buffalo Dam Repairs
Post-Bid
$200,000 to $300,000 est. value
Mount Pleasant, NC 28124

Lake Tabor Dam Spillway Repairs Project
Results
Tabor City, NC 28463

Falls Lake Dam, Vertical Lift Gate - Hydraulic Steel Structure Fabrication
New Construction, Term Contract
Post-Bid
NC

Big Hungry River Upper Dam Modifications
Results
Less than $500,000 est. value
Raleigh, NC 28699

Hydraulic Steel Structure Fabrication of Vertical Lift Gate, Emergency Gate, and Service Gate
Renovation
Post-Bid

Last Updated 10/05/2021 11:50 AM
Project Title

Crabtree Creek Site 22B Lake Lynn Renovation

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $136,809
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project requires coordination of access with the Owner of the park. Majority of the site work will be below water level in the Lake Lynn Dam pool and will require the successful bidding to install a retaining structure or provide diving team to access the work. Dredge sediment clear of the working area. Install a pipe plug and/or block the opening of the emergency opening and install a backup air filled pipe plug in the principal spillway 30” RC pipe. Remove the existing steel slide gate assembly on the outside face of inlet riser, and later, removal of any existing pipe plugs on the inside of the inlet riser and principal spillway. Prepare concrete riser exterior surface by smoothing surfaces and remove any remaining unneeded slide gate hardware all to receive new attachments. Fabricate stainless steel plate attachment with weld neck flange, connect gate valve to the fabricated attachment, and anchor bolt the whole assembly to the face of the concrete riser. Install stainless steel gate valve operating stems, guides and connectors, and install and connect gate valve operation pedestal. Fabricate and install stainless steel trash rack by supporting and anchor bolting the assembly to the concrete riser as shown on the plans

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents