Similar Projects
Us30 at Graham Creek Mp 65.08 - 65.25 Project on the Lower Columbia River Highway (Rt. No. Us30) Near Marshland
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

North Williams Street Storm Improvements
Infrastructure
Results
Lebanon, OR 97355

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Bidding
$7,000,000 to $10,000,000 est. value
OR

Stone Creek Golf Course Pond Restoration Project
Infrastructure
Results
$320,000 est. value
Oregon City, OR 97045

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

US101: MP 348.45 NB Landslide Mitigation
Infrastructure
Results
OR

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Last Updated 12/10/2021 05:31 AM
Project Title

Or42: Slater Crk - Hard Cash Ln and Slide Repair Project

Physical Address View project details and contacts
City, State (County) OR   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 1,205 ft2 temp. signs; 1 ea seq. arr. sign; 2 ea PCMS; 2,500 hrs flag.; 2 ea flag. sta. light.; 115 ea TCS; 1,050 hrs pilot car; 1,000 hrs ped. trans. veh.; 6 ea AFAD; 14,275 ft temp. striping; 350 ft temp. barr.; 2 ea temp. imp. atten.; 1 ea TMA; 2 acres temp. mulch; const. surv. wrk.; 11,156 yd3 exc.; 12,104 yd3 stn. emb.; 300 yd2 geot.; 22 yd3 riprap; 389 ft CIPP liner; 597 ft pipe; 2 ea conc. inlets; 172 ft drain. curb; 2,217 yd2 br. end pan. CPPR; 8 yd2 conc. rep.; 36 yd2 cl. 2 prep.; 1,970 yd2 const. MPCO; 1,089 ft elas. conc. nos.; 941 ft pour. jt. seal; 43,014 ft2 conc. & crk. seal.; 7,184 ft2 poly. memb.; 349 yd2 br. deck CPPR; 113,925 yd2 CPPR; 895 ton aggr. base; 19.6 ton emuls. asph. tk. Coat; 20,270 ton ACP (1,155 ton PG64-22 asph.); 600 yd2 conc. pvmt. repr.; 5,475 ft gd. rl.; 1,325 ft conc. barr.; 907 ea delin.; 217 culv. mrkr.; 18.41 miles rumb. strips; 144,300 ft thermo. striping; 0.5 acres seeding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents