Similar Projects
Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$28,834,000 CJ est. value
Rapid City, SD 57702

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$28,834,000 CJ est. value
Rapid City, SD 57702

Sunburst Drive Reconstruction
Infrastructure
Design
Rapid City, SD 57702

Pavement Rehabilitation Project - Red Rock Canyon Road and Idlewild Court
Infrastructure
Design
Rapid City, SD 57702

Structure, Approach , PCC Surfacing , Lighting - Rapid City Area
Demolition, New Construction, Infrastructure
Bidding
$6,636,000 CJ est. value
Rapid City, SD 57701

Structure, Approach , PCC Surfacing , Lighting - Rapid City Area
Demolition, New Construction, Infrastructure
Bidding
$6,636,000 CJ est. value
Rapid City, SD 57701

RFP D/B - Architectural and Engineering Services, Mineral Industries Building
New Construction, Infrastructure
Post-Bid
$34,000,000 CJ est. value
Rapid City, SD 57701

RFQ D/B - B21 Fuels Construction Contract
Demolition, New Construction, Infrastructure - 7,244 SF
Post-Bid
$100,000,000 CJ est. value
Rapid City, SD 57703

Paving Indefinite Delivery Indefinite Quantity (IDIQ)
Results
$2,000 to $2,500,000 est. value
Rapid City, SD

Pavement Preservation Badlands
Term Contract
Results
$5,000,000 to $7,000,000 est. value
Wall, SD 57790

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$63,391,000 CJ est. value
New Underwood, SD 57761

Last Updated 09/05/2023 04:03 PM
Project Title

RFP Construction Manager at Risk - Construction of the New Female Correctional Facility at SD Womens Prison

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Prison/Jail, Sidewalks/Parking Lot, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Office of the State Engineer, on behalf of the South Dakota Department of Corrections, is soliciting Statements of Qualifications from firms interested in providing Construction Manager at Risk services required for the construction of the New Female Correctional Facility at SD Womens Prison, Rapid City, South Dakota The project consists of new construction for a planned 208 bed female, joint custody facility to include housing, program, visitation, recreation, health services, dietary, laundry and warehouse space. The project will include all necessary site work, utilities, parking, and security fencing needed to complete the facility. Project is anticipated to meet high performance green building standards of two green globes. The project will need to be estimated for future construction and construction timeframe will be determined on funding availability. Firms desiring to be considered for providing professional CMR services for this project should send a Statement of Qualifications that must include examples of past experience on projects with similar size and/or common scope elements. The statement should be a list of projects completed for private and/or universities, state government, and/or local government, and should also include resumes of key personnel and sub consultants who will be assigned to this job. The Statement of Qualifications must also explain how your firm has provided innovative ideas (via examples or methods) that have had a positive impact on schedule, cost, quality, and/or value; discuss your ideas for maintaining a "transparent" structure for bidding and estimating, and explain methods used to ensure qualified, yet cost competitive, subcontracted work. Include owner contact information for your last three comparable CMR projects completed. Evaluation of the proposals will be based on qualification as a Construction Manager at Risk according to ranking criteria below: 1. Specialized expertise, capabilities, and experience as demonstrated by the team's capabilities, and the proposed approach and methodology to meet the project requirements. (20%) 2. Resources available to perform the work, including any specialized services, within the specified time limits for the project. Include resumes of all personnel, including sub-consultants who will be assigned to this project for the entire duration. (20%) 3. Record of past performance, including price and cost data from previous projects, quality of work, ability to meet schedules, cost control, and contract administration. (20%) 4. Ability and project history in handling special project constraints. (10%) 5. Proposed project management techniques. (10%) 6. Availability to project locale. (10%) 7. Familiarity with project locale. (10%) A technical review committee will review the proposals and select a shortlist of firms. Those firms will then be interviewed by the Building Committee, who will make the final selection. Those firms that desire additional information specific to the project may contact Brandon Carda at 605-295-1570.

Details

New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents