Similar Projects
Elections Complex - Buncombe County
New Construction, Infrastructure
Conception
$17,751,479 CJ est. value
Asheville, NC 28805

Sulphur Springs Road Construction - City of Asheville
Infrastructure
Conception
$1,200,000 CJ est. value
Asheville, NC 28806

Woodland Development
New Construction, Infrastructure
Design
$27,000,000 CJ est. value
Asheville, NC 28806

Ingles #79 / Asheville
Addition, Demolition, New Construction, Infrastructure - 20,000 SF
Design
$10,000,000 CJ est. value
Asheville, NC 28803

Shiloh Sidewalks
Infrastructure
Bidding
$80,000 CJ est. value
Asheville, NC 28803

Shiloh Sidewalks
Infrastructure
Bidding
$80,000 CJ est. value
Asheville, NC 28803

Residence Inn By Marriott / Asheville
New Construction, Infrastructure - 135,355 SF
Post-Bid
$29,000,000 CJ est. value
Asheville, NC 28801

Residence Inn By Marriott / Asheville
New Construction, Infrastructure - 135,355 SF
Post-Bid
$29,000,000 CJ est. value
Asheville, NC 28801

Patching and Pavement Preservation
Infrastructure
Results
NC

Sidewalk Construction Along US-19, 23, 74A at I-40 Exit 44
Infrastructure
Results
NC

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

Oakcrest Subdivision
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Asheville, NC 28806

Asheville Family Dentistry
New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Asheville, NC 28805

Garage and Warehouse Improvements - Buncombe County
Renovation, Infrastructure
Conception
$920,000 CJ est. value
Asheville, NC 28801

Last Updated 05/24/2023 02:06 PM
Project Title

Charlotte Street Sidewalk

Physical Address View project details and contacts
City, State (County) Black Mountain, NC 28711   (Buncombe County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 22, 2023, project was awarded to James Almquist SP but awarded amount is not available.** The purpose of this document is to provide general and specific information for the Town of Black Mountain Charlotte Street Sidewalk Construction Project. All bids and contracts are governed by Town of Black Mountain policy and Section 143-131 of the North Carolina General Statutes. The Town is seeking proposals to construct a sidewalk along a portion of Charlotte Street in Black Mountain. The area is adjacent to school property so care must be taken to avoid blocking traffic and safety measures followed. Sidewalk: Install approximately 360 linear feet (0.68 miles) of concrete sidewalk along the East side of Charlotte Street from Village Way to E. State Street. The sidewalk shall be 5' wide and constructed to NCDOT and ADA design standards. The drawing at the top of page 8 shows only a small depiction of section 848 of the NC Department of Transportation specifications for roads and structures. Sidewalk must comply with 2010 ADA standards for accessible design. The purpose of this document is to provide general and specific information for the Town of Black Mountain Charlotte Street Sidewalk Construction Project. All bids and contracts are governed by Town of Black Mountain policy and Section 143-131 of the North Carolina General Statutes. Charlotte Street Sidewalk -Base Bid Project A. Sidewalk: i. Install approximately 360 linear feet (0.68 miles) of concrete sidewalk along the East side of Charlotte Street from Village Way to E. State Street. A survey showing the easement and sidewalk location is attached hereto. ii. The sidewalk shall be 5' wide and constructed to NCDOT standards as set out in Section 848 of the NCDOT Standard Specifications for Roads and Structures. iii. Sidewalk must comply with 2010 ADA standards for accessible design. Direct all inquiries concerning this RFP to: Angela Reece Project Manager Phone: 828-419-9300 x 315 Email: projects@tobm.org The Town is not liable for interpretations/misinterpretations or other errors, or omissions made by the Bidder in responding to this bid. The Bidder shall examine this bid to determine if the Town's requirements and terms and conditions are clearly stated. If, after examination of the various requirements and terms and conditions of this bid, the Bidder believes there are any requirements or terms and conditions which remain unclear or which restrict competition, the Bidder may request, in writing, that the Town clarify the requirement(s) and terms(s) and condition(s) specified by the Bidder. The Bidder must provide the Section(s), Subsection(s), Paragraph(s), and page number(s) that identify the requirements or conditions questioned by the Bidder. Requests for clarification and technical questions to this bid must be received by the Town no later than the date shown above in Section 2, entitled "Bid Schedule", under Deadline for Questions. The Bidders' failure to request clarification and submit questions by the date in the bid schedule above shall be considered to constitute the Bidders' acceptance of all Town requirements and terms and conditions. The Town shall issue addenda reflecting questions and answers to this bid, if any, and shall be posted to the Town's website The Town reserves the right to reject any and/or all bids received as allowed by law, or to select the bid which, in our opinion, is in the best overall interest of the County. The Town will evaluate the contractor on technical understanding of the area of practice the ability to perform the proposed work; ability to complete the project in a given timeframe; ability to maintain communication with town staff; ability to involve partners/stakeholders as necessary; and references. The contractor best meeting the Town of Black Mountain's expectations for experience, qualifications and cost requirements will be selected. Completion- 06/10/2023 Deadline for Questions 5:00 PM 05/02/2023 Job. No- TOBM.00005

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents