Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Caseyville Township East Plant Terminal Lift Station Crane
Renovation
Bidding
IL

3rd Street Lift Station Sewage Grinder Cutting Head Replacement
Renovation
Bidding
West Dundee, IL 60118

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Check Valve Replacement
Results
Gurnee, IL 60031

Lift Station Upgrade
Results
$25,000 to $50,000 est. value
Greenup, IL 62428

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Stony Ridge Chlorine Booster Station
New Construction
Bidding
Grayslake, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Force Main Improvement - Lift Station 23 and 25A
Results
Edwardsville, IL 62025

Lift Station No. 16 Improvements
Renovation
Bidding
Crystal Lake, IL 60014

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Oswego Pump Station Phase 2 Improvements
Results
Oswego, IL 60543

Cambridge on the Lake Lift Station Reconstruction
Renovation
Bidding
Buffalo Grove, IL

Last Updated 11/02/2021 05:41 PM
Project Title

North Aurora Pumping Station Improvements

Physical Address View project details and contacts
City, State (County) North Aurora, IL   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of a 31.5 million gallon per day drywell submersible pumping station; approximately 45 feet of 36-inch-diameter and 75 feet of 24-inch-diameter force mains between the new pumping station and connection points with existing force mains; approximately 275 feet of 42-inch-diameter gravity sewer to convey flows from an existing syphon chamber to the new pumping station; miscellaneous electrical and controls; mechanical improvements; heating, ventilation, and air conditioning improvements; landscape improvements; and site improvements adjacent to the new pumping station. The Work also includes the decommissioning and demolition of the existing North Aurora Pumping Station.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 41 - Material Processing and Handling Equipment.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 44 - Pollution and Waste Control Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents