Similar Projects
Plumbing Services IDIQ
Post-Bid
Stephenville, TX 76402

Plumbing Parts
Term Contract
Post-Bid
Irving, TX

Upgrade Restrooms
Renovation
Results
$25,000 to $100,000 est. value
El Paso, TX 79906

Plumbing Maintenance and Repairs Services
Results
TX

Full Encirclement Repair Clamps and Service Saddles
Term Contract
Post-Bid
Plano, TX

Modular Building Plumbing Installation
Results
San Marcos, TX

Plumbing Remodel
Post-Bid
Grapeland, TX

Plumbing Services
Results
Frisco, TX 75034

Plumbing Services
Post-Bid
Lewisville, TX

Plumbing Services
Results
$125,000 est. value
Irving, TX

Plumbing Labor and Materials
Post-Bid
Houston, TX

Plumbing Maint, and Emergency Repairs at Austin- Bergstrom International Airport
Results
Austin, TX 78719

Plumbing Maintenance, Repair, and Related Services
Term Contract
Post-Bid
Lubbock, TX

Mechanical, Electrical and Plumbing Contractors
Results
Richardson, TX

Job Order Contract for Plumbing Services
Term Contract
Post-Bid
Less than $500,000 est. value
Round Rock, TX

Last Updated 04/04/2019 11:24 AM
Project Title

Alamodome East Hot Water Loop Repair

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78200   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Cap existing heating hot water mains (8") that are routed underground to segment C. Install new 8" heating hot water supply and return lines o segment C, roughly 3,000 linear feet. It is anticipated that the new lines will be routed above ground concealed by planters outside of the central boiler plant. The existing planters will be removed and replanted to conceal the new piping routed above ground outside of the boiler room. The piping will then be routed on the underside of the loading dock, located as to not interfere with any loading or unloading operations. Once inside the building the piping will be routed above the drop ceiling, and will intercept the hot water piping where it enters from underground in the mechanical room. Evaluate the existing pumps and pump head to ensure proper pump operation. Relocated/reroute existing utilities in the building which interfere with the new hot water supply and return pathways.
Details
Division 22 - Plumbing, Common Work Results for Plumbing.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents