Similar Projects
Community Center Boiler Replacement.
Renovation
Sub-Bidding
$300,000 CJ est. value
E Harwich, MA 02645

Replace Roofing System RTI HQ 5222 - Sub Bids
Post-Bid
$2,100,000 est. value
Mashpee, MA 02649

HVAC and Mechanical Products
Term Contract
Post-Bid

Owner's Project Manager for Replacement Heating Ventilation and Air Conditioning (HVAC) System for Yarmouth Police Station
Results
Yarmouth, MA 02673

Repair HVAC B5238
Results
$400,000 est. value
Sandwich, MA 02542

Repair HVAC B5236
Post-Bid
Less than $510,000 est. value
Sandwich, MA 02542

HVAC Improvements at Falmouth High School
Results
$375,000 est. value
Falmouth, MA 02536

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC and R Maintenance Contract- Eastern Massachusetts
Results
$3,000,000 est. value

On-Call Heating Ventilation and Cooling (HVAC) Preventative Maintenance (PM)/Repair Services and Fire System Testing/Inspection Services
Alteration
Post-Bid
Chatham, MA

Convert Fire Stations 3 Exhaust Capture System to Magnagrip 2
Renovation
Results
$10,000 to $50,000 est. value
Yarmouth, MA 02673

On-Call Heating Ventilation and Cooling (HVAC) Preventative Maintenance (PM)/Repair Services for Primary Municipal Buildings
Term Contract, Alteration
Post-Bid
Chatham, MA

Temporary Chiller Police Station
Alteration
Results
West Yarmouth, MA

Air Cooled Chiller Replacement
Term Contract
Post-Bid
Falmouth, Woods Hole, MA 02543

Unit Ventilator Replacement at Centerville Elementary School - General Bid
Alteration
Results
$500,000 est. value
Barnstable, Hyannis, MA 02632

Last Updated 09/22/2022 04:23 PM
Project Title

High Efficiency Boilers and Indirect DHW Tank

Physical Address View project details and contacts
City, State (County) E Harwich, MA 02645   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Boiler Replacement at the Community Center The work to be performed under this contract includes, removal of existing boilers and installation of 2 new high efficiency, stainless steel, water-tube condensing boilers and associated appurtenances as outlined in the specifications. Any questions must be directed to Sean Libby at: slibby@townofharwich.us . Contractors shall be required to comply with all applicable Massachusetts General Law Chapter 30, 39M as amended and all other applicable Massachusetts General laws. The successful bidder will be required to furnish a Payment Bond in the amounts of fifty percent (50%) of the contract amount. To receive consideration, bids shall be submitted on the appropriate forms no later than the above date and time scheduled. Proposals must be accompanied by a bid security in the amount of five percent (5%) of the bid price in the form of a bid bond or certified treasurers or cashiers check issued by a responsible bank or Trust Company. If upon acceptance of the bid, a bidder fails to enter into a contract with the Town of Harwich, the bid security shall be forfeited to and become the property of the Town. Full compliance with Federal, State and Municipal wage laws is required of all work done for the Town of Harwich. Minimum wage rates as determine by the Commissioner of Department of Labor and Industries under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27D as amended, apply to the project. It is the responsibility of the contactor, before bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed work under this contract. Wage Rates dated September 2022 shall be provided in the bid specifications and are applicable to this project. All bidders shall be required to provide Certification of Occupational Safety and Health Administration (OSHA) Training in accordance with Massachusetts General Law 30: Section 39S, as amended by Chapter 306 of the Acts of 2004, effective 7/1/06. Bidders are not to include in their Bid Proposal sales and compensating use taxes on material and supplies purchased for this project. All material used are tax exempt. A weekly certified payroll submittal shall be required of the successful bidder in accordance with MGL C149, S27B. No payments will be made by the Town until all payroll information necessary for the Town to determine compliance with prevailing wage law requirements for the time period of the payment request have been submitted. The Contractor shall not discriminate with regard to the personnel employed on this project on the basis of race, color, creed, national origin, gender, sexual preference, handicap, or age. Selection of the contractor will be based upon bidder qualifications, including evidence of past performance in similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after opening of the bids. The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents