Similar Projects
Water Treatment for Steam Boilers, Open Cooling Systems and Closed Water Systems
Post-Bid
Salt Lake City, UT

HVAC PM for USPS Facilities in the Western Area
Post-Bid
Bernalillo, Torrance, Valencia, NM - Salt Lake City, UT

HVAC Units for Portable Classrooms
Results
Salt Lake City, UT 84115

Redwood Clinic New HVAC System
Results
$1,853,000 est. value
Salt Lake City, UT

Midvale Police Station HVAC Renovation
Post-Bid
Midvale, UT 84047

Parks and Recreation Building HVAC Upgrades
Results
Less than $667,000 est. value
Salt Lake City, UT 84104

Refrigeration Supplies and Equipment
Term Contract
Post-Bid
Less than $60,000 est. value
UT

Southwest Chiller Plant Distribution Phase 6
Results
Less than $1,200,000 est. value
Salt Lake City, UT

HVAC Units
Post-Bid
Salt Lake City, UT

DFCM Construction-Multi Step-Replace Chiller, Cooling Tower, Pumps and VFD'S BCI Office
Results
Less than $500,000 est. value
Taylorsville, UT

Airmation Filters
Post-Bid
Salt Lake City, UT

HCH Suite Remodel - HVAC
Results
$129,000 est. value
Salt Lake City, UT

HVAC Maintenance Services
Post-Bid
Salt Lake City, UT 84119

DFCM Construction-DOH USL Mod 1 Exhaust Return Fan Wall Upgrade
Results
Less than $300,000 est. value
Taylorsville, UT 84129

Wall Mounted HVAC for Portable Classrooms
Term Contract
Post-Bid
Salt Lake City, UT 84070

Last Updated 02/26/2019 08:13 PM
Project Title

Sagepoint #811 - Chiller Replacement

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84113   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $127,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Contractor shall demolish and disposeof existing YORK nominal 120 ton chiller and replace with a like-size chiller .Work shall include removal of relatively new compressor in the existing chiller,and delivery of this compressor to the University.Compressor preparation shall be provided as required in the attached Specification Section 236426.21.Existing chiller operates with HCFC-22 refrigerant.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents