Similar Projects
Floc Drive Room Floor Drain Improvements
Renovation
Sub-Bidding
$50,000 CJ est. value
Ann Arbor, MI 48103

Intermediate School and High School Flooring Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Remus, MI 49340

Flooring Project
Post-Bid
Romulus, MI

Epoxy Floor Replacement
Post-Bid
Rochester, Rochester Hills, MI 48309

Sterling Elementary Roofing Project
Results
Sterling, MI 48659

Flooring - Police and Fire Training Center
Alteration
Results
Troy, MI 48083

Sandusky Elementary School - Gym Flooring
Renovation
Post-Bid
Sandusky, MI 48471

MBMV212806 – Repair Warehouse Floor – BLDG 6901
Term Contract
Results
$250,000 to $500,000 est. value
Battle Creek, MI

Carpet and Vinyl
Alteration
Post-Bid
Rogers City, MI

MBMV212805 – Repair Hangar Floor – BLDG 6900
Term Contract
Results
$250,000 to $500,000 est. value
Battle Creek, MI 49037

Carpet and Flooring and Installation
Alteration
Post-Bid
Ann Arbor, MI 48104

Aquatic Center Structural Repairs (Concrete/Liner Replacement/Well Point)
Alteration
Results
East Lansing, Lansing, MI 48823

Tiles Replacement at the Berwyn Senior Center
Alteration
Post-Bid
Dearborn Heights, MI 48127

Repair Floors Base Wide
Term Contract
Results
$500,000 to $1,000,000 est. value
Battle Creek, MI 49037

Abatement of VCT and Mastic for Flooring at Pine Towers
Alteration
Post-Bid
Bay City, MI

Last Updated 11/10/2022 03:08 PM
Project Title

Fire Headquarters Garage Floor Epoxy Proposal

Physical Address View project details and contacts
City, State (County) Ypsilanti, MI 48198   (Washtenaw County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $23,923 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Fire Station Garage Floor Epoxy Questions are submitted online No Project Overview: o Fire HQ Garage is approximately 7000+/- sq/ft area consisting offour (4) drive thru vehicle storage bays w/curbing approximate 4200 sq/ft. o Two access walkways on North/South sides ofvehicle bays approximately 1,560 sq/ft. o One (20x17) storage room located in the SWC ofgarage approximately 340 sq/ft. o One (10x17) laundry/SCBA maintenance room approximately 170 sq/ft. o One (10x8) bathroom approximately 80 sq/ft. o One (20x17) workshop area approximately 340 sq/ft.(*Owners option) o One (12x17) parts storage room approximately 204 sq/ft. o One (6x17) combustibles storage area estimated 102 sq/ft.(*Owners option)A three step application process consisting of 1) floor preparation, 2) application oftwo (2) coats of 100% epoxy (polyurethane and/or poly-aspartic) finish, 3) Recommendations and Scheduling1) Floor prep a. Mask and cover all areas not receiving epoxy b. Grinding (diamond) for prep in required areas c. Sweep and vacuum up dust and debris from grind d. Fix cracks and imperfection(s) on floor e. Vacuum and/or mop floor with xylene prior to coating f. Prime floor g. Lightly sand floor between coats for maximum bonding and adhesion h. Full broadcast ofpaint chip color selected by Township representative i. Apply 80/120 anti-skid grit for texture and traction purposes to reduce slipperiness j. Clean up and dispose of all job/project related debris

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents