Last Updated | 10/17/2022 03:32 AM |
Project Title | Portable Classroom Buildings Phase II |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX 78211 (Bexar County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Selected Bidders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work is generally described as site improvements to provide utilities rough-in for power, technology, water and sewer to three (3) portable classroom buildings (by Others). Work includes, but is not limited to extension of asphalt parking lot, miscellaneous concrete sidewalks, and modification to chain link fencing. The Work is more particularly described in the Drawings, Specifications, Proposal Documents and other Contract Documents prepared by Garza/Bomberger & Associates (the "Architect"), and shall include all general construction, mechanical, electrical, plumbing, and technology and other work as indicated in the Contract Documents. ESTIMATED PROJECT BUDGET: Three Hundred Thousand Dollars ($300,000.00) including Allowances totaling Ten Thousand Dollars ($10,000.00) based on the Plans/Specifications. The Project must be complete and ready for occupancy not later than August 6, 2021. Any proposal must provide for final completion by this date. The Notice to Proceed shall be contingent upon execution of the Owner-Contractor Agreement. The Contractor shall take this period into account in the preparation of its Proposal. No claim for additional time shall be considered Each proposal must be accompanied by a proposal security in the amount of five percent (5%) of the total proposal, pledging that the successful Contractor will, within ten (10) calendar days after the successful Contractor is notified of the acceptance of its proposal, enter into a written contract with the Owner on the terms stated in the proposal documents, as evidenced by the unconditional execution and delivery of such contract, and furnish payment and performance bonds and evidence of insurance as required by the proposal documents. Should the successful Contractor fail or refuse to enter into such contract or furnish such bonds or evidence of insurance within the time above stated, such proposal security shall be forfeited to the Owner as liquidated damages, not as a penalty |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |