Similar Projects
Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Murphy USA #7058/7855 / Gastonia
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Gastonia, NC 28052

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Bidding
$30,600,000 CJ est. value
Belmont, NC 28056

North Gaston High School Football Field Drainage Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Dallas, NC 28034

RFQ Contractor - Cleveland County Justice Center Phase 2 (BP02B Sitework & Utilities)
Infrastructure
Sub-Bidding
$4,600,000 CJ est. value
Shelby, NC 28150

Advanced Metering Infrustructure
Post-Bid
Stanley, NC

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Duhart Forcemain Replacement
Infrastructure
Results
Gastonia, NC

Old Hickory Grove Road Water Main Improvements
Infrastructure
Results
Mount Holly, NC 28120

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Howe's Landing
New Construction, Infrastructure
Pending Verification
$340,000,000 CJ est. value
Gastonia, NC 28056

Last Updated 01/11/2023 12:09 PM
Project Title

Water System Extension to Serve Paul Beam Road Area Near Cherryville

Physical Address View project details and contacts
City, State (County) Cherryville, NC 28021   (Gaston County)
Category(s) Heavy and Highway, Sewer and Water, Transportation
Sub-Category(s) Misc. Structures, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $997,018 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 11, 2023, the project is pending award. A timeline for award has not been confirmed. The project generally consists of: The installation of approximately 3,700 LF of 8" water line, 2,200 LF of 6" and 4" water line, and all necessary accessories and appurtenances. The project runs along Highway 150/Cherryville/Shelby Road, Paul Beam Road, Brown Waterson Road, Doc Wehunt Road, and West Academy Street. Project also includes 200LF of bore and encasement under CSX railroad tracks

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents