Similar Projects
Cape Lookout State Park Facility Relocations and Demolition
New Construction, Demolition
Conception
Tillamook, OR 97141

Medford Apartments/Springbrook Park
New Construction - 93,093 SF
Conception
Medford, OR

Oregon Coast Aquarium Renovation Phase 2
New Construction, Renovation, Infrastructure - 10,650 SF
Design
$18,000,000 CJ est. value
Newport, OR 97365

Oregon Square Plaza Pavilion
New Construction, Renovation, Infrastructure - 10,800 SF
Design
$2,000,000 CJ est. value
Portland, OR 97232

Nehalem Bay State Park Staff Housing Site Improvement Project
Infrastructure
Bidding
$450,000 CJ est. value
Nehalem, OR 97131

Lincoln School Park Renovation
Demolition, Renovation
Bidding
$870,000 CJ est. value
Eugene, OR 97402

Winchester Bay Commercial Building
New Construction
Post-Bid
Winchester Bay, OR 97467

RFQ Design - Qualifications Based Services for Clackamas County Fairgrounds and Event Center
Term Contract
Post-Bid
Canby, OR 97013

Fieldhouse Indoor Track Surface
Renovation
Results
La Grande, OR 97850

Tualatin Community Park Restroom Improvements
Renovation
Results
$82,046 CJ est. value
Tualatin, OR 97062

Recreation and Aquatic Center - City of Lake Oswego
New Construction
Construction
$47,000,000 CJ est. value
Lake Oswego, OR 97034

Wings & Waves Waterpark and Hotel Development
New Construction, Infrastructure, Renovation - 99,000 SF
Pending Verification
$35,000,000 CJ est. value
McMinnville, OR 97128

Spray Park Renovation - City of Forest Grove
Renovation
Conception
$900,000 CJ est. value
Brothers, OR 97712

Broadway Field Renovation
New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Seaside, OR 97138

Replace Ranger Cabin Foundation Post
Renovation, Infrastructure
Post-Bid
$25,000 CJ est. value
Cave Junction, OR 97523

Last Updated 07/03/2023 02:04 AM
Project Title

Crater Lake National Park Building 116 Chimney Stabilization

Physical Address View project details and contacts
City, State (County) White City, OR 97604   (Klamath County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $89,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The National Park Service (NPS) at The National Park Service (NPS) at Crater Lake National Park (CRLA) has a requirement for chimney stabilization on Building 116. The building is a one-story conference center with a historic stone masonry chimney. The project is located at Crater Lake National Park, 570 Rim Village Drive, Crater Lake, OR 97604. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. Per FAR 36.204 the project range is estimated to be between $100,000 and $250,000. The North American Industry Classification System (NAICS) Code for this requirement is 238110, with a corresponding size standard of $19 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Quotations are solicited only from small business concerns. Quotations received from concerns that are not small business concerns shall not be considered. The Government anticipates award of a firm-fixed-price purchase order resulting from this solicitation. Evaluation for award will be made in accordance with the simplified acquisition procedures outlined in FAR Part 13.106. The Government anticipates issuing an order resulting from this request for quotation to the responsible quoter whose quotation will be most advantageous to the Government, price and other factors considered as listed in the Request for Quotation (see Section M). See Section J Attachment 1: Project Specifications, and Section J Attachment 2: Construction Drawings, for a detailed description of the requirement. Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a quotation. SITE VISIT information can be located in Section L. A SITE VISIT is scheduled for Thursday, May 18, 2023, at 10 a.m. Pacific Daylight Time. RSVP is required. See Section L for more information. Submit questions only through email to the person identified in Section L. Quotations must be received in their entirety via email as instructed in Section L no later than the date and time specified in Block 13 of the SF 1442. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents