Similar Projects
The Dalles Riverfront Access
Infrastructure
Design
$1,334,217 CJ est. value
The Dalles, OR 97058

The Dalles Riverfront Access
Infrastructure
Design
$1,334,217 CJ est. value
The Dalles, OR 97058

Discovery Center Water System Expansion Project - 2023
Infrastructure
Bidding
$350,000 CJ est. value
The Dalles, OR 97058

Mosier EV Charging Station Project
Infrastructure
Post-Bid
$172,000 CJ est. value
Mosier, OR 97040

Mosier EV Charging Station Project
Infrastructure
Post-Bid
$172,000 CJ est. value
Mosier, OR 97040

Central Oregon Curb Ramps Phase 1
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

Mosier #2 Well Decommission and Replace
Infrastructure
Results
$900,000 CJ est. value
The Dalles, OR 97058

Sorosis Park - Phase 1 Improvements
Infrastructure
Construction
$1,020,000 CJ est. value
The Dalles, OR 97058

Sorosis Park - Phase 1 Improvements
Infrastructure
Construction
$1,020,000 CJ est. value
The Dalles, OR 97058

US 197: Maupin to BLM Access Improvements
Infrastructure
Design
$505,475 CJ est. value
Maupin, OR 97037

NORCOR Parking Lot
Infrastructure
Post-Bid
$300,000 CJ est. value
The Dalles, OR 97058

South Apron Reconstruction, New Taxilanes and New Fuel Apron
Infrastructure
Results
$2,962,501 CJ est. value
The Dalles, OR 97058

Last Updated 06/16/2023 09:12 AM
Project Title

5th Street Sidewalk Improvements 2023

Physical Address View project details and contacts
City, State (County) Dufur, OR 97021   (Wasco County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $451,650 [brand] Estimate
Plans Available from Civil Engineer - 05/08/23
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall include the removal and reconstruction of asphalt concrete roadway, as well as the installation of new 12-inch storm drain pipe and new curb, sidewalk, and Americans with Disabilities Act (ADA) curb ramps constructed on the North side of 5th Street. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information for such questions are as follows: A. Anderson Perry & Associates, Inc., Attention: Bill Ledbetter, Construction Administrator, bledbetter@andersonperry.com The Work includes, but is not limited to, traffic control; earthwork, asphalt pavement removal; installation of approximately 675 feet of storm drain pipe; installation of catch basins, manholes, curb, sidewalk, and ADA curb ramps; asphalt and gravel restoration; and other work specified and/or shown on the Drawings. The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law The Project has an expected duration of 90 days. The Project includes the following Work: The Work includes, but is not limited to, traffic control; earthwork, asphalt pavement removal; installation of approximately 675 feet of storm drain pipe; installation of catch basins, manholes, curb, sidewalk, and ADA curb ramps; asphalt and gravel restoration; and other work specified and/or shown on the Drawings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents