Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

La Bahia Hotel
New Construction
Conception
Santa Cruz, CA 95060

Food 4 Less #364-03
Renovation
Design
Inglewood, CA 90303

Ralphs Grocery #021-03
Renovation
Design
South Pasadena, CA 91030

Raising Cane's #590
New Construction - 3,526 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Chino, CA 91710

Raising Cane's #617
New Construction - 3,273 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Vacaville, CA 95687

Ralphs Grocery #274-02
New Construction
Post-Bid
Los Angeles, CA 90019

Ralphs Grocery #206-02
Renovation
Post-Bid
Los Angeles, CA 90027

Arena Califino
New Construction
Construction
$30,000,000 est. value
Oceanside, CA 92058

Raising Cane's #570
New Construction - 3,579 SF
Construction
$500,000 to $1,000,000 CJ est. value
Elk Grove, CA 95624

East Village Quarter Tailgate Park Mixed Use Development
New Construction
Pending Verification
San Diego, CA 92101

Atari Hotel
New Construction
Pending Verification
San Jose, CA

Stay Open Hotel
New Construction, Renovation, Addition
Conception
San Diego, CA 92101

Food 4 Less #772-03
Renovation
Design
Signal Hill, CA 90755

Jeni's Splendid Ice Creams
Renovation - 1,057 SF
Bidding
San Diego, CA 92104

Reported 08/17/2021 10:40 AM
Project Title

Eighth Street Commercial Center

Physical Address View project details and contacts
City, State (County) Stockton, CA 95206   (San Joaquin County)
Category(s) Commercial
Sub-Category(s) Car Wash, Food/Beverage Service, Gas Station, Hotel/Motel, Supermarket/Convenience Store, Vehicle Sales/Service
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project entails construction of a retail commercial development on vacant contiguous parcels located at the northwest corner of West Eighth Street and Interstate 5. The retail center site consists of five 5 existing parcels totaling approximately 18.1-acres. Parking and on-site circulation area for customers would be shared amongst all parcels and sustained with a shared parking agreement. Project details are specified below: Building A - Future quick-serve restaurant. This building would be a single-story wood or metal stud frame structure have approximately 3,600 square feet of floor area for cooking and indoor dining. Fast food/takeout restaurants are required to provide one (1) parking space per 100 square feet, which equates to 36 parking spaces. Buildings B & C - Future quick-serve restaurants, one drive-thru. This building would be a single-story wood or metal stud frame structure have two (2) suites approximately 3,200 square feet of floor area for cooking and indoor dining each, for a total of 6,400 SF. Fast-food/takeout restaurants are required to provide one (1) parking space per 100 square feet, which equates to 64 parking spaces. Building D - Future quick-serve restaurant with drive-thru. This building would be a single-story wood or metal stud frame structure of approximately 3,200 square feet of floor area for cooking and indoor dining each, with a drive through. Fast food/takeout restaurants are required to provide one (1) parking space per 100 square feet, which equates to 32 parking spaces. Building E - A stand-alone, unattended carwash. The carwash would be a single-story wood or metal stud frame “tunnel” carwash, with a conveyor approximately 140 feet in length and within a structure of approximately 3,600 square feet. The carwash will provide 27 vacuum stations to the west of the main facility. Self-service car washes are required to provide one (1) parking space. Building F - A fueling station and convenience store. The fueling station component would have twelve (12) multi-pump dispensers that would serve up to 24 vehicles at a time. An 8,924 square foot canopy would cover the dispensing pumps. The convenience store would be in a single-story wood or metal stud frame structure approximately 10,000 square feet in floor area. If a Use Permit is approved as part of this application, the convenience store would be licensed for Type 20 - Off-Sale Beer and Wine. Convenience stores are required to provide one (1) parking space per 150 square feet, which equates to 67 parking spaces. Fueling stations are required to provide one (1) space per 400 square feet of canopy area, which equates to 22 spaces. The total required parking for the fueling station and convenience store is 89 spaces. Building G - A truck fueling, truck wash, and truck repair buildings. Building G would be a wood or metal stud frame structure have approximately 10,080 square feet of floor area inclusive of two (2) wash bays for trucks and two (2) service bays for trucks, as well as nine (9) multi-pump dispensers that could serve ten (10) trucks at a time. Fueling stations are required to provide one (1) space per 400 square feet of canopy area, which equates to 12 spaces. . Self-service car washes are required to provide one (1) parking space. The repair bay is being calculated at a rate of one (1) space per 400 square for Maintenance/Minor Repair, yielding a total of 12 spaces. The total required parking for the truck fueling, truck wash, and truck repair building is 25 spaces. Building H- A three-story, 120 room hotel. Building H would be a three (3) story wood or metal stud frame structure of approximately 48,000 square feet of floor area with 120 rooms. Hotel uses are required to provide one (1) parking space guest room, plus four (4) parking spaces, which equates to 124 parking spaces. While a hotel is planned at this location, they are not pursuing a Land Development Permit since there is no alcohol proposed in conjunction with the hotel at this time.

Details

,, 93,804 SF - Car Wash, 3,600 SF New Construction, Building, Gas Station, 8,924 SF New Construction, 12 Fuel Pump(s), Food/Beverage Service, 6,400 SF New Construction, Building, Food/Beverage Service, 3,600 SF New Construction, Building, Food/Beverage Service, 3,200 SF New Construction, Building, Supermarket/Convenience Store, 10,000 SF New Construction, Building, Vehicle Sales/Service, 10,080 SF New Construction, Building, Hotel/Motel, 3 Stories Above Grade, 48,000 SF New Construction, 120 Unit(s).
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Office Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents