Similar Projects
Cliff Avenue Asphalt Overlay
Infrastructure
Bidding
$1,176,636 est. value
Sioux Falls, SD 57105

Benson Road Improvements from N Bahnson to N Sycamore Avenue
Infrastructure
Bidding
$2,586,000 est. value
Sioux Falls, SD 57104

Concrete Pavement Restoration and Joint Re-Seal
Infrastructure
Post-Bid
Brandon, SD 57005

Buffalo Lake Healthcare Center
Alteration
Post-Bid
Sioux Falls, SD 57105

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Interchange Improvements - I-90 and Marion Road
Results
Less than $724,000 est. value
Sioux Falls, SD

Structure 332 Steel Girder , Gravity Large Concrete Block Wall
Infrastructure
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Highway 149 Reconstruction
Infrastructure
Post-Bid
$4,250,000 est. value
SD

Marion Road Improvements, 41st Street to 57th Street
Results
Less than $895,092 est. value
Sioux Falls, SD 57100

Grading, Storm Sewer, Curb and Gutter, PCC Surfacing, Row, Signals and Lighting
Infrastructure
Post-Bid
SD

Rushmore Area Reconstruction - Phase I
Results
$5,300,000 est. value
Brandon, SD

Chip Sealing and Crack Sealing
Infrastructure
Post-Bid
SD

Phillips Avenue Improvements - 14th Street to 18th Street
Results
$1,327,780 est. value
Sioux Falls, SD

Brandon Core Area Reconstruction Phase 2
Infrastructure, Alteration
Post-Bid
Brandon, SD

Last Updated 06/06/2022 01:15 AM
Project Title

Highway 130 and 137 Intersection Improvements

Physical Address View project details and contacts
City, State (County) Crooks, SD 57020   (Minnehaha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct the intersection of County Highway130 & County Highway 137 including the addition of left turn lanes in the NB and SB directions and a right turn lane in the WB direction. Construct signal flasher, overhead light, flashing LED stop signs, and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents