Similar Projects
South Lake Development - Master Plan
New Construction - 5,272 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bowie, MD 20715

Bowie Town Center Lot 6
New Construction - 1,082,332 SF
Conception
Bowie, MD

Renovate Labs, Offices, and Stairways at BARC - Building 007
Renovation
Bidding
$100,000 to $250,000 est. value
Beltsville, MD 20705

Hampton Park Apartments
New Construction, Demolition - 238,183 SF
Post-Bid
Capitol Heights, MD 20743

The Hub at College Park
New Construction - 187,617 SF
Post-Bid
Less than $500,000 CJ est. value
College Park, MD 20742

College Park Gateway
New Construction - 562,699 SF
Construction
$10,000,000 CJ est. value
College Park, MD 20740

National Harbor Parcel 7
New Construction - 82,000 SF
Construction
Oxon Hill, MD

Maryland Hillel Center
New Construction - 40,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
College Park, MD

Royal Farms #381 - Greenbelt
New Construction - 9,017 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Greenbelt, MD 20770

The Landing At Woodyard
Renovation - 12,200 SF
Post-Bid
Clinton, MD 20735

Tempo - Student Housing
New Construction - 403,000 SF
Construction
Less than $500,000 CJ est. value
College Park, MD 20740

3200 Rhode Island Avenue
New Construction
Pending Verification
$30,000,000 est. value
Mount Rainier, MD 20712

Department of Justice - Executive Office for Immigration Review Interior Renovation
Renovation - 63,707 SF
Post-Bid
Hyattsville, MD 20782

Fort Washington Medical Center - Executive Office
Renovation - 3,160 SF
Construction
Fort Washington, MD 20744

Parliament Place
New Construction - 366,312 SF
Pending Verification
$10,000,000 CJ est. value
Lanham, MD 20706

Last Updated 12/28/2021 11:59 AM
Project Title

Hampton Park Health and Human Services Building

Physical Address View project details and contacts
City, State (County) Capitol Heights, MD 20743   (Prince Georges County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced September 2019, Construction Complete as of December 2021
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

,, 183,000 SF - Office, 6 Stories Above Grade, 100,000 SF New Construction, Parking Garage, 2 Stories Above Grade, 83,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents