Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

HVAC Maintenance-Greenville
Results
Greenville, SC

Courthouse Cooling Towers
Results
Greenville, SC 29607

Prisma Health Boiler Services
Post-Bid
Greenville, SC

Courthouse Roof - Mechanical
Results
Greenville, SC 29607

HVAC Upgrades at Fort Mill High School, B, C, and E Wings
Post-Bid
Fort Mill, SC 29715

Waste Water Treatment Services
Term Contract
Results
Greenville, SC 29601

HVAC Renovation Project at Berea Elementary School
Post-Bid
Greenville, SC 29617

HVAC Preventive Maintenance
Results
Greenville, SC

4 Exhaust Ventilation Systems for Mauldin Fire Department
Post-Bid
Greenville, Mauldin, SC 29662

HVAC System at Victor Gym
Results
Greer, SC

HVAC and Electrical Services
Term Contract
Post-Bid

HVAC Equipment and Installation
Results
Greenville, SC 29607

Partial HVAC Replacement at Blue Ridge Middle School
Post-Bid
Greer, SC 29651

Reported 04/25/2019 12:00 AM
Project Title

HVAC Renovation Project at Oakview Elementary School

Physical Address View project details and contacts
City, State (County) Simpsonville, SC 29681   (Greenville County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description To replace HVAC systems at Oakview Elementary School over the course of the summer of 2019 and summer 2020. Work Includes: 1. Replacing Thru-the-wall unit ventilators with single zone VRF systems. 2. Replacing rooftop package units. 3. Reconfiguring existing electrical system to accommodate the new HVAC system. 4. Sealing all holes associated with existing HVAC systems that are being removed. 5. Repairing the floor where damaged by existing HVAC system. 6. Repair finishes damaged by existing HVAC system. 7. Documentation and photos of all work performed provided to Project Manager and A/E at every other weekly meeting (Bi-weekly report). 8. Weekly update meeting to include Contractor's Project Manager and Head Technician on the site. 9. Clean up daily Phase 1 - Summer 2019: 1. Install new ductless split HVAC units. (Existing through wall units will be abandoned in place.) 2. Seal building envelope 3.. Demo work for rooftop units ACU-4 and 7 and HP-1, 2, 3, and 4 will be performed in Phase 1. (These rooftop units are being removed and not replaced. The roof curbs are being used for mounting some condensing units.) Phase 2 - Summer 2020: 1. Replace existing rooftop units. 2. Remove existing through wall unit (brick in opening, repair floor)
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents