Similar Projects
Corridor Improvements Phase 2 - Shive Lane
Infrastructure
Bidding
Bowling Green, KY 42128

KY 234 - Asphalt Resurfacing
Infrastructure
Bidding
KY

Warren County Road
Infrastructure
Post-Bid
Bowling Green, KY 42101

Improve Site Rear Plaza
Infrastructure
Post-Bid
Bowling Green, KY 42101

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Pavement (with Alternates)
Results
KY

Street Repair/Resurfacing
Infrastructure
Post-Bid
Oakland, KY

Asphalt Surfacing Ultra Thin
Results
KY

Street Cut Repairs
Infrastructure
Post-Bid
Bowling Green, KY

Asphalt Resurfacing
Results
KY

Asphalt Surface With Grade and Drain
Results
KY

Bowling Green Downtown Improvements Phase II
Results
Bowling Green, KY

Asphalt Pavement and Roadway Rehab
Results
KY

Asphalt Resurfacing
Results
KY

Asphalt Resurfacing
Infrastructure
Results
KY

Last Updated 01/11/2022 04:57 PM
Project Title

Production Avenue Extension and Fred Madison Realignment

Physical Address View project details and contacts
City, State (County) Bowling Green, KY   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Grade, drain, surfacing and utilities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents