Similar Projects
Shop Improvements - Foam Insulation, Lights & Heater
Alteration
Bidding
$25,000 to $100,000 est. value
Federal Dam, MN

Construction Manager at Risk - East Campus Air-Handler Replacement
Alteration
Bidding
$4,500,000 est. value
White Bear Lake, MN 55110

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Kennedy Secondary School Chiller Replacement
Alteration
Bidding
$200,000 est. value
Fergus Falls, MN 56537

Natatorium HVAC
Post-Bid
Rochester, MN

Madison Elementary School HVAC Replacement and Deferred Maintenance - Phase 2
Results
Blaine, Minneapolis, MN 55434

Cladding, Roofing, and HVAC Upgrades
Alteration
Bidding
$400,000 est. value
Roseville, MN 55113

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

Monroe Elementary School HVAC Replacement and Deferred Maintenance - Phase 3
Results
Anoka, MN

Facility HVAC Services
Post-Bid
Burnsville, MN

Controls Upgrade - MVH
Results
Less than $580,000 est. value
Fergus Falls, MN 56537

Last Updated 05/11/2022 04:35 AM
Project Title

East Hall Variable Air Volume and BAS Upgrades

Physical Address View project details and contacts
City, State (County) Rochester, MN   (Olmsted County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the replacement of existing electric variable air volume (VAV) boxes and electric heating coils throughout the East Hall Building (46 VAV boxes total) with new single duct VAV boxes with hot water reheat coils and associated valves, piping, and controls. In addition to the VAV box replacement, a 150 KW electric heating coil located in the existing East Hall air handling unit will also be replaced with a new hot water heating coil. The project includes extension of heating water supply mains and branch piping to the East Hall Building to serve the new VAV boxes and AHU coils and tee fittings and valves will be provided for future heating water extension to Hill Theater, College Center, and Art Hall. Additionally, the work will include but is not limited to, all related electrical modifications, ceiling modifications, specialties, and finishes.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents