Similar Projects
Flat Creek Drive South Waterline - Town Of Jackson
Alteration
Conception
$360,000 est. value
Jackson, WY 83001

Gregory Lane (SPET Complete Street) - Town of Jackson
Infrastructure
Conception
$1,859,000 CJ est. value
Jackson, WY 83001

Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Jackson, WY 83001

Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Jackson, WY 83001

Snake River Landing Improvements Phase 3, Moose Landing
New Construction, Infrastructure - 700 SF
Bidding
$5,000,000 CJ est. value
Moose, WY 83012

Snake River Landing Improvements Phase 3, Moose Landing
New Construction, Infrastructure - 700 SF
Bidding
$5,000,000 CJ est. value
Moose, WY 83012

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

District 3 Stockpiles
Infrastructure
Results

WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Results
Jackson, Teton Village, WY 83001

AMK Ranch Seawall Improvements
Infrastructure
Construction
$496,578 CJ est. value
Moran, WY 83013

South Park Loop Road Residential Subdivision
New Construction, Infrastructure
Pending Verification
$32,500,000 CJ est. value
Jackson, WY 83001

South Park Loop Road Residential Subdivision
New Construction, Infrastructure
Pending Verification
$32,500,000 CJ est. value
Jackson, WY 83001

Vine Street (Complete Street/Water/Sewer) 825 LF Pipe - Town of Jackson
Infrastructure
Conception
$500,000 est. value
Jackson, WY 83001

Teton Science School Residential Development Phase I
Demolition, New Construction, Infrastructure
Design
$1,200,000 CJ est. value
Wilson, WY 83014

Last Updated 02/09/2023 12:35 PM
Project Title

Gregory Lane Complete Street/Drainage - Town of Jackson

Physical Address View project details and contacts
City, State (County) Jackson, WY 83001   (Teton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $1,650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined As of July 07, 2022, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents