Similar Projects
FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Houston, TX

Construction of the Lake E Phase 2 and Lake H to Serve Pomona
Infrastructure
Bidding
TX

Construction of Water, Sewer and Drainage Improvements for Mustang Crossing Section 7
Infrastructure
Bidding
Alvin, TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Mustang Bayou Bank Repair at National Oaks Park
Post-Bid
Alvin, TX 77511

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Holiday Lakes Flood and Drainage Improvements
Results
$671,062 est. value
Angleton, TX 77515

Canal System Restoration Project Site Group IV
Infrastructure
Bidding
$2,000,000 est. value
TX

Piper Road Drainage Project
Post-Bid
Pearland, TX

Water Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Savannah County Road 58 Phase V
Results
TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

Manvel Town Center Public Detention Ponds Phase 1A and Manvel Town Center Public Utilities Phase 1A
Results
TX

Drainage Improvements Project Phase I
Infrastructure
Post-Bid
Houston, TX

Big Island Lake to Serve Pomona and Water, Sanitary Sewer and Drainage Facilities With Alternate Paving and Appurtenances to Serve Pomona Section 17
Results
Less than $1,990,655 est. value
TX

Repair and Rehabilitation of the Caroline Tunnels for Harris County Precinct 2
Infrastructure
Post-Bid
Houston, TX

Last Updated 09/16/2021 09:33 AM
Project Title

Canal System Restoration Project Site Group III

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents