Similar Projects
RFQ Engineering - Engineering Services Related for the Removal of Per- and Polyfluoroalkyl Substances at the Crooked Springs Water Treatment Plant
Infrastructure
Conception
$10,000,000 CJ est. value
N Chelmsford, MA 01863

Concrete Repairs Bourne & Sagamore Bridges, Cape Cod Canal, Bourne
Infrastructure
Design
$5,000,000 CJ est. value
Concord, MA 01742

Concrete Repairs Bourne & Sagamore Bridges, Cape Cod Canal, Bourne
Infrastructure
Design
$5,000,000 CJ est. value
Concord, MA 01742

Wastewater Treatment Facility Phase 2 Upgrades - GC Bid
Renovation
Bidding
$15,000,000 CJ est. value
Hudson, MA 01749

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

2021 Lead Service Line Replacement - Contract Two
Post-Bid
Malden, MA

Advanced Metering Infrastructure (AMI) Solution
Post-Bid
Groton, MA

Oak Hill Road, Plain Road, and Moore Road Water, Stormwater and Transportation Infrastructure Improvements
Results
Less than $7,700,000 est. value
Westford, MA 01886

Hayden Rowe Street Water Main Improvements
Results
Less than $1,200,000 est. value
Hopkinton, MA 01748

922 Massachusetts Avenue Renovation
New Construction, Renovation
Construction
Cambridge, MA 02139

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

St. Andrews Episcopal Church Solar Canopy
Alteration
Pending Verification
Framingham, MA 01702

Newton Centre Playground Resurfacing Improvements
Infrastructure
Design
$357,159 CJ est. value
Newton, MA 02459

Land Clearing Management
Post-Bid
Hanscom A F B, MA

Last Updated 07/28/2022 09:37 AM
Project Title

Partridge Lane Pump Station Rehabilitation and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Burlington, MA 01803   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Partridge Lane Pump Station Rehabilitation and Force Main Replacement for the Town of Burlington, Massachusetts. The scope of work includes replacement of an existing sewer pump station, installation of approximately 700 linear feet of 4-inch high-density polyethylene force main and other related tasks in the Town of Burlington, Massachusetts.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents