Similar Projects
Streetscape And Road Improvements - West Avenue, Quincy, Orchard And Butler Streets - City of Norwalk
Infrastructure
Conception
$1,100,000 est. value
Norwalk, CT

East Avenue Roadway And Bridge Reconstruction - City of Norwalk
Renovation, Infrastructure
Conception
$4,273,000 est. value
Norwalk, CT 06854

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

Langankes Landing
New Construction, Infrastructure - 48,648 SF
Design
$13,330,000 CJ est. value
Shelton, CT 06484

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Petremont Lane ClockTower Apartments
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Shelton, CT 06484

Petremont Lane ClockTower Apartments
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Shelton, CT 06484

Bituminous Concrete Paving Improvements Summer / Fall 2021
Infrastructure
Results
Weston, CT

Riverside Avenue Roadway and Sidewalk Improvements
Infrastructure
Results
Westport, CT 06880

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

Danbury Proton
New Construction, Infrastructure - 14,400 SF
Pending Verification
$80,000,000 CJ est. value
Danbury, CT 06810

Riverview Park Royal
New Construction, Infrastructure - 10,000 SF
Pending Verification
$34,000,000 CJ est. value
Shelton, CT 06484

Wall Street Area Sidewalk And Historic Street Light Project - City of Norwalk
Alteration
Conception
$425,000 est. value
Norwalk, CT

Oldfield Road Apartments
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Fairfield, CT 06824

Last Updated 03/06/2023 05:05 AM
Project Title

Pavement Rehabilitation on I-95

Physical Address View project details and contacts
City, State (County) Greenwich, CT 06830   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $61,474,166 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As per the Owner the project has been Withdrawn. Editorial Content Team is actively seeking updated information State Project Number(s) & Description: Project No. 56-316; Pavement Rehabilitation on I-95 in the Towns of Greenwich and Stamford Required Prequalification Work Classification(s): 5 - Paving and Associated Construction - Limited Access Highways/Freeways Federal-aid Project Number(s) & Funding Source: FHWA (F.A.P. No. 0951(386)) & State Pre-Bid Conference and/or Site Visit Information: N/A District Number(s) : 3 - New Haven Contract DBE % Goal or SBE % Set-Aside: DBE 5% Project Scope Code: L - $ 30,000,000 - $ 39,999,999 Completion Date : 488 Calendar Days Liquidated Damages Rate: 8,900.00 Day DBE Submittal Requirements - The two (2) lowest bidder's DBE Commitment Approval Request form(s) meeting the established DBE contract goal percentage or Good Faith Effort (GFE) Application Request including all "backup" documentation, as applicable, are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the DBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. SBE Submittal Requirements - The low bidder's SBE Commitment Approval Request form(s) meeting the established SBE set-aside percentage or Request for Waiver application are due to the Department no 736later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the SBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. Prequalification Requirements: Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Bid Proposal Forms: All prospective bidders requesting to obtain the official Bid Proposal Form must submit a completed Bid Proposal Request Form (Part C) to the DOT Contracts Unit per the above instructions. If the Bid Proposal Request Form (Part C) and the Contractor Prequalification Application are found to be satisfactory, the bidder will receive an email response from the Department instructing the bidder to download the electronic Bid Proposal Form Bid Bond Security: Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Department s (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid; or (b) the bidder has on file in the Contract Section a current Department (CTDOT) standard annual bid bond form, satisfactory to the Commissioner, on the form furnished by the Department. DOT encourages bidders to file an Annual Bid Bond with the Department so that the bidder does not have to submit a bid bond each time they bid on a specific project/proposal. At the time of the bid opening, the surety must be a corporate surety licensed by the Insurance Commissioner of the State of Connecticut and must hold a Certificate of Authority as an acceptable Surety and/or Reinsuring Company acceptable to the Federal Department of Treasury. The surety's underwriting limitation must not be less than the full amount required by the bond itself. Pre-Bid Questions and Answers: Questions pertaining to DOT advertised construction projects must be presented through the CTDOT Pre-Bid Q and A Website. The Department cannot guarantee that all questions will be answered prior to the bid date. Please Note - at 9:00 am Monday (i.e. typical Wednesday Bid Opening) the project(s) being bid will be closed for questions, at which time questions can no longer be submitted through the Q and A Website. Answers may be provided by the Department up to 12:00 noon, the day before the bid. At this time, the Q and A for those projects will be considered final, unless otherwise stated and/or the bid is postponed to a future date and time to allow for further questions and answers to be posted. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. Prevailing Wage Rates: The minimum rates to be paid labor of the various classifications shall be in accordance with current schedule of wages established by the State Labor Commissioner as provided in the Connecticut General Statutes, as revised. The Contract Wage Certification Form is to be submitted to the Labor Commissioner before the award of the contract. The Department, prior to the awarding of any contract, may require further financial and other information from any applicant who becomes the low bidder for that contract. The Commissioner of Transportation reserves the right to reject any and all bids. CTDOT - Pavement Rehabilitation on I-95 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions pertaining to DOT advertised construction projects must be presented through the CTDOT Pre-Bid Q and A Website. The Department cannot guarantee that all questions will be answered prior to the bid date. PLEASE NOTE - at 9:00 am Monday (i.e. typical Wednesday Bid Opening) the project(s) being bid will be closed for questions, at which time questions can no longer be submitted through the Q and A Website. Answers may be provided by the Department up to 12:00 noon, the day before the bid. At this time, the Q and A for those projects will be considered final, unless otherwise stated and/or the bid is postponed to a future date and time to allow for further questions and answers to be posted. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents